Laserfiche WebLink
<br /> Page 3 of 6 <br /> <br /> <br />4. Right of Way <br />Right of Way costs shall be permanent right-of-way, permanent utility and/or drainage easements, <br />temporary easements, title work costs, appraisal costs, relocation specialist costs, relocation costs, and <br />condemnation commissioner costs. If applicable, the City shall pay their share of the final right of way <br />cost. The estimated amount is set forth in Table 1. <br /> <br />5. County-Furnished Material <br />County-furnished material costs shall be items such as light poles, traffic signal control equipment, and <br />street name signs which are separately procured outside of the construction contract and installed <br />within the Project limits. The City shall pay their share of the final County-furnished material cost. The <br />estimated amount is set forth in Table 1. <br /> <br />6. The costs and shares attributable to the City and payable to the County as shown in Table 1 are merely <br />estimated and a final reconciliation of costs as set forth in Section G below shall be done at the end of <br />the Project. Actual City costs and shares are based on the following: <br />a. Construction shall be based on the contractor's unit prices and final quantities at Project <br />completion including all contract changes. <br />b. Design engineering shall be based on the contractor’s unit prices at the time of contract award. <br />c. Construction engineering/contract administration shall be based on the contractor’s unit prices <br />and final quantities at Project completion including all contract changes and liquidated damages. <br />d. Right of way shall be based on the final costs to acquire right of way. <br />e. County-furnished material shall be based on the final costs to acquire County-furnished <br />material. <br /> <br />G. PAYMENT <br />1. Construction and Construction Engineering/Contract Administration <br />a. After the County has awarded the construction contract, the County shall update Exhibit B to <br />conform the Exhibit to the amounts in the awarded bid and shall invoice the City 10 percent of the <br />City's estimated construction and construction engineering/contract administration cost based on <br />the updated Exhibit B. <br />b. During construction, the County shall submit to the City partial estimates of work performed by the <br />contractor. The City shall pay to the County its share of the partial estimate as determined in Section <br />F. <br />c. Upon substantial completion of the work the County shall submit to the City a final invoice and final <br />reconciliation of costs. The reconciliation will add or subtract contract amendments to the City’s <br />Project components, adjustments for liquidated damages pursuant to Section I., and previous <br />Project cost payments made by the City to the County. <br /> <br />TABLE 1 – ESTIMATED COSTS <br />City of Lake Elmo Cost Summary <br />ITEM TOTAL COST CITY SHARE FUNDING APPLIED CITY COST <br />Construction $27,433,500 $4,667,400 $3,190,000 $1,477,400 <br />Design Engineering $3,131,400 $532,300 $0 $532,300 <br />Construction <br />Engineering/Contract <br />Administration <br />$2,194,700 $373,400 $0 $373,400 <br />Right of Way $9,950,000 $4,750,000 $4,750,000 $0 <br />County Furnished Material $203,700 $50,900 $0 $50,900 <br />TOTAL ESTIMATED COST $42,913,300 $10,374,000 $7,940,000 $2,430,000