Laserfiche WebLink
1060495(1) 80% STATE STP, 20% STATE MATCH (capped), Remainder 100% COUNTY <br />(P) = PLAN QUANTITY <br />ITEM SP 8204-57, SP 082-617-014 UNIT QUANTITY UNIT PRICE COST <br />NUMBER TH 36 WORK ITEM (1) <br />2401.503 TYPE S (TL-4) 42" BARRIER CONC (3S52) LIN FT 511.00 158.00 80,738.00 <br />2406.503 EXPANSION JOINTS, DESIGN E8 LIN FT 198.00 156.50 30,987.00 <br />2406.504 BRIDGE APPROACH PANELS SQ YD 409.00 411.00 168,099.00 <br />2411.507 STRUCTURAL CONCRETE (1G52) CU YD 669.00 700.00 468,300.00 <br />2411.507 STRUCTURAL CONCRETE (3B52) CU YD 97.00 1,978.00 191,866.00 <br />2411.507 STRUCTURAL CONCRETE (3G52) CU YD 1,024.00 900.00 921,600.00 <br />2411.508 REINFORCEMENT BARS POUND 64,510.00 1.65 106,441.50 <br />2411.508 REINFORCEMENT BARS (EPOXY COATED) POUND 132,369.00 1.80 238,264.20 <br />2411.601 STRUCTURE EXCAVATION LUMP SUM 1.00 435,000.00 435,000.00 <br />2411.601 DRAINAGE SYSTEM LUMP SUM 1.00 35,000.00 35,000.00 <br />2411.618 ARCH SURFACE FINISH (SINGLE COLOR) SQ FT 7,864.00 3.00 23,592.00 <br />2411.618 ARCH CONC TEXTURE (THIN BRICK) SQ FT 1,284.00 50.00 64,200.00 <br />2411.618 ARCH CONC TEXTURE (LIMESTONE) SQ FT 7,864.00 26.00 204,464.00 <br />2451.507 FINE AGGREGATE BEDDING (CV) (P) CU YD 646.00 47.00 30,362.00 <br />2452.502 C-I-P CONCRETE TEST PILE 80 FT LONG 12" EACH 7.00 19,000.00 133,000.00 <br />2452.503 C-I-P CONCRETE PILING 12" LIN FT 4,550.00 55.00 250,250.00 <br />2452.601 STEEL SHEET PILING (TEMPORARY) LUMP SUM 1.00 150,000.00 150,000.00 <br />2501.502 15" GS PIPE APRON EACH 2.00 530.00 1,060.00 <br />2501.502 15" RC PIPE APRON EACH 3.00 1,135.00 3,405.00 <br />2501.502 18" RC PIPE APRON EACH 6.00 1,145.00 6,870.00 <br />2501.502 24" RC PIPE APRON EACH 1.00 1,287.00 1,287.00 <br />2501.502 30" RC PIPE APRON EACH 4.00 1,710.00 6,840.00 <br />2501.502 36" RC PIPE APRON EACH 2.00 2,342.00 4,684.00 <br />2501.502 42" RC PIPE APRON EACH 1.00 3,258.00 3,258.00 <br />2501.205 54" RC PIPE APRON EACH 2.00 3,250.00 6,500.00 <br />2501.502 15" CS SAFETY APRON EACH 8.00 820.00 6,560.00 <br />2501.502 15" RC SAFETY APRON EACH 4.00 1,200.00 4,800.00 <br />2501.502 18" RC SAFETY APRON EACH 1.00 1,404.00 1,404.00 <br />2501.502 24" RC SAFETY APRON EACH 4.00 1,513.00 6,052.00 <br />2501.503 15" CS PIPE CULVERT LIN FT 1,275.00 75.00 95,625.00 <br />2501.503 24" CS PIPE CULVERT LIN FT 12.00 75.00 900.00 <br />2501.503 18" RC PIPE CULVERT DES 3006 LIN FT 89.00 92.00 8,188.00 <br />2501.503 24" RC PIPE CULVERT DES 3006 LIN FT 164.00 100.00 16,400.00 <br />2501.503 30" RC PIPE CULVERT DES 3006 LIN FT 152.00 140.50 21,356.00 <br />Data is considered Non-public prior to project award under the <br />Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13.- 4 -