1060495(1) 80% STATE STP, 20% STATE MATCH (capped), Remainder 100% COUNTY
<br />(P) = PLAN QUANTITY
<br />ITEM SP 8204-57, SP 082-617-014 UNIT QUANTITY UNIT PRICE COST
<br />NUMBER TH 36 WORK ITEM (1)
<br />2550.503 3" NON-METALLIC CONDUIT LIN FT 50.00 20.25 1,012.50
<br />2550.503 POWER CABLE 1 CONDUCTOR NO 2 LIN FT 90.00 4.20 378.00
<br />2550.503 POWER CABLE 2 CONDUCTOR NO 14 LIN FT 3,750.00 5.90 22,125.00
<br />2550.503 POWER CABLE 3 CONDUCTOR NO 8 LIN FT 900.00 6.45 5,809.14
<br />2550.503 POWER CABLE 3 CONDUCTOR NO 14 LIN FT 350.00 2.75 962.50
<br />2550.601 FIBER OPTIC CABLE TESTING LUMP SUM 1.00 18,000.00 18,000.00
<br />2550.602 FIBER OPTIC PIGTAIL TERMINATION EACH 4.00 2,500.00 10,000.00
<br />2550.602 FIBER OPTIC CABLE SPLICING EACH 4.00 4,000.00 16,000.00
<br />2550.602 BURIED CABLE SIGN EACH 41.00 145.00 5,945.00
<br />2550.602 PULL VAULT EACH 14.00 2,920.00 40,880.00
<br />2550.602 NON-INTRUSIVE DETECTION HARDWARE EACH 1.00 13,067.00 13,067.00
<br />2550.602 LOOP DETECTOR DESIGN NMC PREFORMED EACH 4.00 2,000.00 8,000.00
<br />2550.603 REMOVE CONDUIT LIN FT 50.00 10.00 500.00
<br />2550.603 ARMORED FIBER OPTIC PIGTAIL CABLE 6SM LIN FT 600.00 2.37 1,423.80
<br />2550.603 FIBER OPTIC TRUNK CABLE 72SM LIN FT 9,800.00 2.90 28,420.00
<br />2550.603 1.5" BORED CONDUIT LIN FT 1,825.00 20.00 36,500.00
<br />2550.603 2" BORED CONDUIT LIN FT 1,100.00 21.00 23,100.00
<br />2554.502 GUIDE POST TYPE B EACH 28.00 200.00 5,600.00
<br />2554.502 ANCHORAGE ASSEMBLY - TENSION CABLE EACH 2.00 12,000.00 24,000.00
<br />2554.502 END TREATMENT-TANGENT TERMINAL EACH 2.00 3,730.00 7,460.00
<br />2554.503 TRAFFIC BARRIER DESIGN BULLNOSE LIN FT 200.00 198.25 39,650.00
<br />2557.503 WIRE FENCE DESIGN W-1 VINYL COATED LIN FT 318.00 55.00 17,490.00
<br />2554.503 TRAFFIC BARRIER DESIGN TYPE 31 LIN FT 388.00 40.00 15,520.00
<br />2554.503 TRAFFIC BARRIER DESIGN TRANS TYPE 31 LIN FT 226.00 100.00 22,600.00
<br />2554.603 TENSION CABLE GUARDRAIL LIN FT 3,562.00 37.25 132,684.50
<br />2557.603 TEMPORARY GLARE SCREEN LIN FT 12,700.00 5.25 66,675.00
<br />2563.601 TRAFFIC CONTROL SUPERVISOR LUMP SUM 1.00 15,000.00 15,000.00
<br />2563.601 TRAFFIC CONTROL LUMP SUM 0.67 500,000.00 335,000.00
<br />2563.61 FLAGGER HOUR 500.00 135.00 67,500.00
<br />2563.61 POLICE OFFICER HOUR 50.00 300.00 15,000.00
<br />2563.613 PORTABLE CHANGEABLE MESSAGE SIGN UNIT DAY 100.00 125.00 12,500.00
<br />2563.615 TEMPORARY IMPACT ATTENUATOR ASSEMBLY 2.00 3,085.00 6,170.00
<br />2563.615 RELOCATE TEMPORARY IMPACT ATTENUATOR ASSEMBLY 6.00 760.00 4,560.00
<br />2564.502 INSTALL SIGN EACH 5.00 700.00 3,500.00
<br />Data is considered Non-public prior to project award under the
<br />Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13.- 7 -
|