Laserfiche WebLink
WATERSHED REQUIREMENTS & SEPTIC <br /> The minimum floor elevation for a new building is 976.8 feet, shown in orange.Construction of an accessory structure in compliance with city setbacks and minimum floor elevation would require substantial grading activity which would disturb the wetland areas, cause tree removals, and disturb/compact area around the septic, while also restricting access to the septic manhole. <br />The minimum floor elevation <br />for a new building is 976.8 <br />feet, shown in orange. <br />Construction of an accessory <br />structure in compliance with <br />city setbacks and minimum <br />floor elevation would require <br />substantial grading activity <br />which would disturb the <br />wetland areas, cause tree <br />removals, and disturb/compact <br />area around the septic, while <br />also restricting access to the <br />septic manhole.