My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-26 Planning Commission Meeting Packet
LakeElmo
>
Commissions and Committees
>
6 - Planning Commission
>
02 - Packets
>
2020's
>
2026
>
04-13-26 Planning Commission Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2026 12:40:02 PM
Creation date
6/8/2026 12:38:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br />Date: March 24, 2026 <br /> <br /> <br />To: Sophia Jensen, Senior Planner RE: Highpointe Crossing Residential Estate <br /> Nathan Fuerst, Planning Consultant Preliminary Plat/PUD Engineering Review <br /> Jason Stopa, Community Development Director <br /> Pete Tholen, Public Works Director <br /> Nate Stanley, City Engineer <br /> Chad Isakson, Assistant City Engineer <br />From: Jack Griffin, Sr. Project Manager <br /> <br /> <br />An engineering review has been completed for the Highpointe Crossing Residential Estate Preliminary <br />Plat/PUD received on January 12, 2026. This review consisted of the following documentation: <br />· Preliminary Plat/PUD Narrative, dated February 26, 2026. <br />· Preliminary Plat, Sheets PP1-PP6, dated January 11, 2026. <br />· Preliminary Plans, Sheets 1-28, dated February 26, 2026. <br />· Stormwater Management Plan, dated February 25, 2026. <br />· Landscape Plan, dated February 24, 2026. <br /> <br /> <br />STATUS/FINDINGS: Engineering has prepared the following review comments. A condition of Preliminary <br />Plat approval, if granted, must require the applicant to revise and resubmit Preliminary Plat/Plans to <br />address each review comment and condition of approval to the satisfaction of city staff prior to the city <br />accepting a Final Plat/Plan application. All public improvements constructed to support the development <br />must be designed and constructed in accordance with City Engineering Design Standards Manual, unless <br />specifically approved by the city. A point-by-point response letter must accompany plan resubmittal to <br />document plan changes made to address each item and to facilitate city review. <br /> <br /> <br />PRELIMINARY PLAT/SITE PLANS <br />1. All Outlots, Lot and Block numbers, and street names (proposed and existing) have been shown <br />as required on the Preliminary Plat, Site Plans, Street and Utility Plans, and Grading Plans. <br />2. The Preliminary Plans and Preliminary Plat must be revised to identify Outlot ownership either by <br />adding a table to the title sheets or by labeling each Outlot throughout all plan sheets. <br />3. Outlot A (Pond 2), Outlot B (Pond 3), Outlot C (Basin 1SW), Outlot D (Pond 5), and Outlot E (Basin <br />1E) will be dedicated to the city for stormwater management. No drainage and utility easements <br />are needed over the Outlots as they will be city owned. <br />4. The Preliminary Plat and Preliminary Plans must be revised to add Lot easements adjacent to the <br />Overhead Power easement for lots L2B2; L3B2; L6B1, and L5B1. <br />5. Dedicated drainage and utility easements, minimum 10-feet wide, are required along all public <br />roadway frontage as shown on the Preliminary Plat and Plans. All easement areas must be free
The URL can be used to link to this page
Your browser does not support the video tag.