My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-26 Planning Commission Meeting Packet
LakeElmo
>
Commissions and Committees
>
6 - Planning Commission
>
02 - Packets
>
2020's
>
2026
>
06-08-26 Planning Commission Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2026 12:43:12 PM
Creation date
6/8/2026 12:40:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inwood 10 LLC <br />Project B14-08413 <br />December 3, 2014 <br />Page 9 <br />If site grading and construction is anticipated during cold weather, snow and ice should be removed from <br />cut and fill areas prior to additional grading. No fill should be placed on frozen subgrades. No frozen soils <br />should be used as fill. Frost should not be allowed to penetrate below the footings. If winter excavation <br />and filling activities are planned, we recommend material selected for backfill and fill (to achieve design <br />grades) consist of clean, coarse sand with less than 12 percent passing a #200 sieve. Frost should not be <br />permitted to penetrate below footings. Compaction effort will vary with depth of fill placed and the <br />structure it intends to support. Based on the anticipated fill depths, soil types and structures, in most <br />areas we anticipate typical levels of compaction in the range of 95 to 100 percent of standard Proctor <br />would be suitable, but would be further defined as part of the final evaluation. <br />D.1.d.Grade Raises <br />As final grades were not provided for this preliminarily evaluation, should engineered fill be placed to <br />raise grades, considerations should be made in regards to long term consolidation of the native soils. <br />Small grade raises on the order of 2 to 5 feet may be made with minimal risk of post construction <br />consolidation of the exposed underlying native soils and the fill itself. Long-term consolidation of the <br />soils, especially if clay is used for fill or filled upon, may be a consideration if grade raises extend above <br />5 feet. <br />D.2.Spread Footings <br />D.2.a.Embedment Depth <br />For frost protection, we recommend embedding perimeter footings at least 42 inches below the lowest <br />exterior grade in heated portions of the building. Interior footings may be placed directly below floor <br />slabs. We recommend embedding building footings not heated during construction, and footings in <br />unheated areas at least 60 inches below the lowest exterior grade. <br />D.2.b.Net Allowable Bearing Pressure <br />Based on the soil boring results and the above-described site grading procedures, it is our opinion the <br />exposed glacial soils and engineered fill would be anticipated for support of spread footings sized for an <br />allowable soil bearing pressure from 2,000 to 5,000 pounds per square foot. <br />D.3.Interior Slabs <br />D.3.a.Subgrade Modulus <br />After the site grading and building pad preparation has been completed, we anticipate the floor subgrade <br />will be engineered fill or suitable native soils. We recommend using a modulus of subgrade reaction, k, of
The URL can be used to link to this page
Your browser does not support the video tag.