My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-26 Planning Commission Meeting Packet
LakeElmo
>
Commissions and Committees
>
6 - Planning Commission
>
02 - Packets
>
2020's
>
2026
>
06-08-26 Planning Commission Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2026 12:43:12 PM
Creation date
6/8/2026 12:40:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inwood 10 LLC <br />Project B14-08413 <br />December 3, 2014 <br />Page 15 <br />inferred to some extent. Strata boundaries may also be gradual transitions, and can be expected to vary <br />in depth, elevation and thickness away from the exploration locations. <br />Variations in subsurface conditions present between exploration locations may not be revealed until <br />additional exploration work is completed, or construction commences. If any such variations are <br />revealed, our recommendations should be re-evaluated. Such variations could increase construction <br />costs, and a contingency should be provided to accommodate them. <br />F.2.Continuity of Professional Responsibility <br />F.2.a.Plan Review <br />This report is based on a limited amount of information, and a number of assumptions were necessary to <br />help us develop our recommendations. It is recommended that our firm review the geotechnical aspects <br />of the designs and specifications, and evaluate whether the design is as expected, if any design changes <br />have affected the validity of our recommendations, and if our recommendations have been correctly <br />interpreted and implemented in the designs and specifications. <br />F.2.b.Construction Observations and Testing <br />It is recommended that we be retained to perform observations and tests during construction. This will <br />allow correlation of the subsurface conditions encountered during construction with those encountered <br />by the borings, and provide continuity of professional responsibility. <br />F.3.Use of Report <br />This report is for the exclusive use of the parties to which it has been addressed. Without written <br />approval, we assume no responsibility to other parties regarding this report. Our evaluation, analyses <br />and recommendations may not be appropriate for other parties or projects. <br />F.4.Standard of Care <br />In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under <br />similar circumstances by reputable members of its profession currently practicing in the same locality. No <br />warranty, express or implied, is made.
The URL can be used to link to this page
Your browser does not support the video tag.