My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-26 Planning Commission Meeting Packet
LakeElmo
>
Commissions and Committees
>
6 - Planning Commission
>
02 - Packets
>
2020's
>
2026
>
06-08-26 Planning Commission Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2026 12:43:12 PM
Creation date
6/8/2026 12:40:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br />Date: May 18, 2026 <br /> <br /> <br />To: Sophia Jensen, Senior Planner Re: Inwood Commercial Addition <br /> Nathan Fuerst, Planning Consultant Preliminary Plat/Plans <br /> Jason Stopa, Community Development Director <br /> Pete Tholen, Public Works Director <br /> Nate Stanley, City Engineer <br /> Chad Isakson, Assistant City Engineer <br />From: Jack Griffin, Sr. Project Manager <br /> <br /> <br />An engineering review has been completed for the Inwood Commercial Addition Preliminary Plat/Plans <br />for a 5-lot commercial subdivision located at PID 3302921120006. The review consisted of the following <br />documentation received April 29, 2026: <br />· Inwood Commercial Addition Preliminary Plat/Plans dated April 23, 2026. <br />· Inwood Commercial Addition Stormwater Management Plan dated April 23, 2026. <br />· Inwood Commercial Addition Storm Sewer Design dated April 23, 2026. <br />· Inwood Avenue/9th Street Full Intersection Exhibit dated April 20, 2026. <br /> <br /> <br />STATUS/FINDINGS: As a condition of Preliminary Plat approval the applicant must revise and resubmit <br />Preliminary Plat/Plans to address each review comment and condition of approval to the satisfaction of <br />City staff prior to commencement of grading or prior to the City accepting a Final Plat/Plan application. <br /> <br />All subdivision improvements must be constructed in accordance with the City Engineering Design <br />Standards dated March 2026. All plan notes and details must be updated accordingly. <br /> <br /> <br />PRELIMINARY PLAT/PLANS <br />1. No Outlots are proposed as part of this Subdivision. <br />2. The Preliminary Plat and Plans must be revised to provide additional right-of-way along Irene <br />Avenue at the intersection with 10th Street. A minimum boulevard of 16-feet is required from the <br />back of curb from the proposed right-turn lane. <br />3. The Preliminary Plat and Plans must be revised to provide additional easement width over the <br />proposed bituminous trails along both Inwood Avenue and 10th Street. Trail location and minimum <br />easement width to be determined jointly by Washington County and Lake Elmo Public Works. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.