My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-048
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2026
>
2026-048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:49:39 AM
Creation date
7/8/2026 11:49:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve <br />Highpoint Crossing Final Plat subject to the following conditions: <br />1. Prior to the City Council signing or approving recording the final plat, the applicant shall fully <br />address all comments in the following review memos, or any subsequent review memos, to the <br />satisfaction of the City: <br />a. City Engineer's memo dated 7/l/2026 <br />b. City Landscape Architect's memo dated 6/30/2026 <br />c. City Fire Chief s memo dated 3/24/2026 <br />2. Prior to the City Council signing or approving recording the final plat, the applicant shall <br />demonstrate that the plans reflect compliance with Valley Branch Watershed (VBWD) review <br />requirements and that the applicant provide the City evidence that all conditions attached to a <br />VBWD permit will be met before the starting any grading activity on the site. <br />3. The applicant shall provide the power line corridor easement encroachment agreement to the City for <br />review and approval of the terms of said agreement. <br />4. The applicant shall obtain all necessary permits including but not limited to all applicable City <br />permits (building, grading, sign, etc.), Washington County ISTS permits, NPDES/SWPPP permits <br />and Valley Branch Watershed District approval before starting any grading or construction activities. <br />5. Wetland buffer signage in the City's standard form shall be placed on all lots with wetland buffer <br />areas. <br />6. The applicant/developer is responsible, at their own expense, for installing all required right of way <br />and pedestrian improvements. <br />7. Storm water ponds shall be placed on separate outlots and conveyed to the City through a warranty <br />deed in a form acceptable to the City. <br />8. The applicant/developer shall provide the City a fee in lieu of park land dedication as required by <br />Section 103.00.150 to be paid prior to recording of the final plat. <br />9. All easements as requested by the City Engineer and Public Works Department shall be documented <br />on the Final Plat before the execution of the final plat by City Officials. <br />10. If necessary, the applicant shall provide the City with a copy of written permission for any off -site <br />grading work and storm sewer discharges to adjacent properties before starting any site work, <br />grading and as part of any final plat application. <br />11. If applicable, a storm water maintenance and easement agreement in a form acceptable to the City <br />shall be executed and recorded with the final plat. <br />12. Before the execution and recording of a final plat for the development, the developer or applicant <br />shall enter into a Developer's Agreement. Such an Agreement must be approved by the City <br />Attorney and by the City Council. The Agreement shall delineate who is responsible for the design, <br />construction and payment for the required improvements with financial guarantees therefore. <br />13. The applicant or developer shall enter into a separate grading agreement with the City before starting <br />any grading activity in advance of final plat approval. The City Engineer shall review any grading <br />plan that is submitted in advance of a final plat, and said plan shall document the extent of any <br />proposed grading on the site. <br />14. That the Applicant must record the final plat within 180 days after City Council approval or the final <br />plat shall be considered void sinless a request for a time extension is submitted in writing and <br />approved by the City Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.