Laserfiche WebLink
Memorandum <br />1 <br />TO: Sophia Jensen <br />FROM: Patrick O’Keeffe, PLA <br />DATE: 6/5/2026 <br />RE: - Landscape Warranty Inspection | Northport – 1st Addition <br /> <br /> Initial <br />Inspection <br />Initial <br />Re- <br />inspection <br />(Acceptance) <br />1-Year <br />Inspection <br />1-Year <br />Re- <br />inspection <br />2-Year <br />Inspection <br />2-Year <br />Re-inspection <br />Final <br />Inspection <br />Acceptance <br />Northport – 1st Addition <br /> 09/12/2024 09/02/2025 <br />09/17/2025 <br />10/03/2025 <br />05/29/2026 <br /> <br />Inspectors <br />• Patrick O’Keeffe, PLA <br />Inspection Summary <br />• An on-site landscape inspection was conducted with the landscape contractor, to assess the condition <br />and performance of the installed landscape elements. Based on this review, the site has met the City’s <br />requirements for final acceptance. <br />Required Actions <br />No further actions are required. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Patrick O’Keeffe, PLA (MN, CO) <br />Landscape Architect <br />P: (651) 324-5277 | E: Patrick@hkgi.com <br />800 WASHINGTON AVE N STE 207 MPLS, MN 55401 | HKGI.COM