Laserfiche WebLink
(6) LIST THE REQUIRED MATERIALS ONLY AND THE ESTIMATED MATERIAL COSTS <br />FOR THE PROJECT (soil amendments, herbicide, plant materials, seed, sod, construction materi- <br />als, weed fabric, mulch, rodent protection, etc.) DO NOT INCLUDE LABOR OR EQUIPMENT. <br />PROJECT MATERIALS QUANTITY ESTIMATED COST <br />(on state right of way only) <br />6a t i // o u <br />K714'7 <br />TOTAL MATERIAL COST/ ',22- <br />(Include Sales Tax and Shipping) <br />F10 MR. <br />THROUGH COMPLETION OF INSTALLATION. <br />