Laserfiche WebLink
77509 <br />ARTICLE III - GENERAL PROVISIONS <br />Section A. Installation and Maintenance by the City <br />After acquisition of the landscape materials, the City shall install <br />the landscape materials along Trunk Highway No. 5 and provide for the <br />proper maintenance thereof, without cost or expense to Mn /DOT. <br />Maintenance shall include, but not be limited to; removal and, -r'� <br />replacement of all materials that fail to survive. Criteria for <br />maintenance and replacement are shown and described in EXHIBIT "A ", <br />Maintenance Responsibilities Plan and Schedule, which is attached <br />hereto and made a part hereof by reference. <br />Section B. Responsibilities of the City <br />The City shall, in connection with the landscape materials <br />acquisition, installation and maintenance, comply with the following <br />conditions: <br />1. Use of Mn /DOT right -of -way shall in no way impair or interfere <br />with the safety or convenience of the traveling public in its use <br />of the highway. <br />2. Preserve and protect all utilities located on lands covered by <br />this Agreement, without cost or expense to Mn /DOT. <br />3. As required by Minnesota Statute 21GD (1996), notify Gopher State <br />One Call System (1- 800 -252 -1166) at least 48 hours before any <br />excavation is done on this project. <br />4. No advertising signs or devices of any form or size shall be <br />constructed or shall be permitted to be constructed or placed <br />upon Mn /DOT right -of -way covered by this Agreement. <br />5. Upon completion of the installation of landscape materials and <br />during performance of maintenance operations, restore all <br />6 <br />