My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2005-047
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2000's
>
2005
>
Resolution 2005-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:40:27 PM
Creation date
2/13/2014 9:18:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF LAKE ELMO <br />WASHINGTON COLNT , MINNESOTA <br />RESOLUTION NO, 2005-047 <br />A RESOLUTION APPROVING THE OPEN SPACE PRESERVATION <br />DEVELOPMENT CONCEPT PLAN OF DISCOVER CROSSING. <br />WHEREAS, on the 21" day of April, 2005, MBM Development, LLC <br />( "Applicant ") and Elizabeth Lundquist submitted a completed application requesting that <br />the City of Lake Elmo approve an Open Space Preservation Development Concept Plan <br />for 24 residential lots on 71.6 acres; and <br />WHEREAS, on the 91h day of May, 2005, at a public hearing, the Lake Elmo <br />Planning Commission reviewed the Development Application, the City Planner's reports <br />and comments, the comments of the Applicant and the Applicant's representatives, and <br />recommended approval of the Development Application based upon the following <br />Findings: <br />I. Except as noted regarding OP buffer compliance, the OP Concept Plan generally <br />complies with the OP design standards as can be determined at the Concept Plan <br />Stage. <br />2. The Concept Plan is generally consistent with the purpose of the Open Space <br />Preservation Ordinance. <br />3. The Concept Plan generally complies with the Comprehensive Plan. <br />NOW, THEREFORE, BE IT RESOLVED that the Lake Elmo City Council <br />hereby: <br />Approves the Open Space Concept Plan for DISCOVER CROSSING as <br />illustrated on the Concept Plan prepared by Folz, Freeman, Erickson, Inc., staff dated <br />May 4, 2005 with the following conditions: <br />1. All house pads shall be at least 200 feet form the south property line and 100 feet <br />from the west property line. <br />2. Applicant shall clearly demonstrate by graphics the year round effectiveness of <br />buffering proposed within the 100 foot west OP buffer. <br />3. Applicant shall submit preliminary plans to provide water supply from a single <br />community well and lateral service to home sites. <br />4. Applicant shall submit preliminary plans to treat wastewater with a single <br />Constructed. Wetlands Wastewater Treatment System (or technologically <br />equivalent) with sewer laterals to the individual home sites. <br />5. The Development Stage Plan and Preliminary Plat shall show easement for an <br />east/west service road along the north property line reflecting the MnDOT graphic <br />as presented the Planning Commission. <br />6. Deletion. of the project monument sign. <br />
The URL can be used to link to this page
Your browser does not support the video tag.