Laserfiche WebLink
G. Applicant has not submitted a comprehensive report inventorying existing <br />towers, structures or other sites within the Lake Jane neighborhood that could <br />be used for the proposed wireless telecommunication tower and has not <br />demonstrated conclusively why existing towers, structures or other sites within <br />the Lake Jane neighborhood could not be used. <br />H. Applicant has not provided documentation to justify a tower height Of 3.25 feet <br />or possibly 3.io feet. <br />Applicant has not provided RIF information for the proposed site as outlined in <br />the Comi Report. <br />J. Applicant has not provided electrical and structural engineering analysis and <br />certification as outlined in the Comi Report. <br />K. Applicant has not provided corrected letters from property owners as addressed <br />in the Comi Report. <br />L. Applicant has not provided authorization from the property owner and/or from <br />T-Mobile as addressed in the Comi Report. <br />3.0 Based upon the above reasons, the application of FMHC is denied. <br />Date: February 3, 2009 <br />F:\users\Jessica\Jerry\LE\Resolution -Denying Application.via.doc <br />N <br />/y <br />By: <br />De an Johnston <br />Mayor <br />