My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2011-026
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2010's
>
2011
>
Resolution 2011-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:36:14 PM
Creation date
5/12/2014 3:42:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1) The structure must be anchored to resist flotation, collapse, and lateral movement. <br />2) All portions of the structure located below the Base Flood Elevation (BFE) must be <br />constructed of flood-resistant materials. <br />3) The structure be designed to allow for the automatic entry and exit of flood waters. <br />4) Mechanical and utility equipment must be elevated or flood proofed at or above the BFE. <br />5) The structure shall comply with the floodway encroachment provisions of the National <br />Flood Insurance Program (NFIP) Regulations. <br />6) The structure shall be limited to parking and storage. <br />7) Compliance with these conditions must be satisfied at the time a building permit is issued <br />for the structure and will be verified during routine inspections required as part of the <br />building pennit. <br />Passed and duly adopted this 19th day of July 2011 by the City Council of the City of Lake Elmo, <br />Minnesota. <br />Dean A. Johnston, <br />ATTEST: <br />7 City Messelt, City ministrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.