My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2011-007A
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2010's
>
2011
>
Resolution 2011-007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:36:14 PM
Creation date
5/12/2014 3:58:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Promptly after the City has assigned or exercised its option, the City will arrange <br />to conduct a site inspection of the Property at its cost, including any additional environmental <br />testing determined as mutually necessary for construction of proposed Facility. The City will <br />promptly provide the District with copies of all written reports that result from the inspection, <br />including test results. The City may terminate this Agreement by written notice to District if, <br />based on the results of the investigation and in the reasonable exercise of its discretion, the City <br />determines that the Project is not feasible or practical. The City's notice of termination must be <br />given in the manner provided in ARTICLE III. <br />D. The City will expedite consideration of all necessary City development approvals <br />that are required for the development of the Property with the Facility, consistent with the Project <br />schedule set forth in Exhibit B. <br />E. At its cost, the City will prepare all necessary plans and specifications for the <br />construction of the sanitary sewer system to service the Property. Bids for such specifications <br />and construction will be issued by the City no later than April 30, 2011. The City will award a <br />contract for the construction of the sanitary sewer and water system in the manner required by <br />law. All work to be done constructing and installing the sanitary sewer and water system shall <br />be done subject to the approval of the City Engineer in accordance with City standards and <br />requirements but shall be sufficient to fully serve the Property and the Facility thereon. The <br />contract letting process and the construction of the improvements must be done in a timely <br />fashion in accordance with the Project Schedule attached as Exhibit B. <br />F. The City shall Bold harmless and defend the District from any and all claims made <br />by anyone for any defects or damages of any kind caused by the installation and /or construction <br />of the sanitary sewer system. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.