My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINAL ORDINANCE NO. 80-84
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
1990's
>
1993
>
FINAL ORDINANCE NO. 80-84
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:25:48 PM
Creation date
2/26/2015 1:34:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 303.100 B. The cost of all structural alternations or additions both inside <br />and outside of a structure to any nonconforming structure over the life of the structure <br />shall not exceed 50 percent of the market value of the structure unless the conditions <br />of this Section are satisfied. The cost of all structural alterations and additions and <br />additions constructed since the adoption of Lake Elmo's initial flood plain controls must <br />be calculated into today's current cost which will include all costs such as construction <br />materials and a reasonable cost placed on all manpower or labor. If the current cost of <br />all previous and proposed alterations and additions exceeds 50 percent of the current <br />market value of the structure, then the structure must meet the standards of Section <br />303.050. <br />SECTION 2. EFFECTIVE DATE: This ordinance shall become effective the day <br />following its publication. <br />Adopted by the City Council of the City of Lake Eo this 16th y of February, 1993. <br />r <br />Wyn john, M#8r <br />Attest: <br />Mary Kueffner, City Administrator <br />Published in the Stillwater Gazette on the 24th day of February, 1993.
The URL can be used to link to this page
Your browser does not support the video tag.