My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINAL ORDINANCE NO. 80-99
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
1990's
>
1994
>
FINAL ORDINANCE NO. 80-99
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:26:01 PM
Creation date
2/27/2015 10:16:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
without required inspection, City Engineer shall have the discretion to accept or <br />reject all or part of said improvement, by giving appropriate written notice to the <br />developer. <br />Subd. 5. Acceptance of improvements by the City Engineer may be subject to <br />such reasonable conditions as he may impose at the time of acceptance. Developer, <br />through his engineer, shall provide for competent daily inspection during the <br />construction of all improvements. As -built drawings, which shall include service <br />and valve ties, on reproducible mylar shall be delivered to the City Engineer within <br />60 days of completion of the improvements together with a written certification from <br />a registered engineer that all improvements have been completed, inspected and <br />tested in accordance with City -approved plans and specifications. <br />Subd. 6. Changes to Construction Plans and Specifications. All changes to the <br />construction plans and specifications must be approved by the City Engineer. <br />Subd. 7. Developer shall remove all soil, and debris from, and clean all streets <br />within, the lands developed at least every two months (or within one week from the <br />date of any request by City), during the period commencing May 1 and ending <br />October 31, of each year, until such time as such streets and improvements are <br />accepted for ownership and maintenance by the City. In the event there are or will <br />be constructed on the property, two or more streets, and if permanent street signs <br />have not been installed, developer shall install temporary street signs in accordance <br />with recommendations of the Maintenance Department, prior to the issuance of any <br />permit to build upon the property. <br />Subd. 8. Within 20 days of installation of utilities and street curbs in any portion of <br />the land developed (if said time occurs between May 1, and October 31 of any year, <br />developer shall sod (secured with a minimum of two stakes per roll of sod) that part <br />of the property lying between said curb and a line 18 inches measured perpendicular <br />with the curb or in lieu of said sod, place a fiber blanket with seed approved by the <br />City Engineer (secured with stakes a maximum minimum of 6 feet apart). Either <br />sod or fiber must be placed upon a minimum of 4 inches of topsoil. The topsoil <br />shall be level with the top of the curb at the curb line and rise 1/4" (one-quarter <br />inch) for each foot from the curb line. Developer shall maintain the sod, fiber <br />blanket, topsoil, and grade until such time as the streets and improvements in the <br />development are accepted for ownership and maintenance by the City. Developer <br />shall also sod all drainage swales serving each 1.5 acres a minimum distance of 6 <br />feet on each side of the center of the swale. <br />Subd. 9. Subsequent to approval by the Council and before execution by the City <br />of the final plat or other appropriate forms of City approval, developer shall:
The URL can be used to link to this page
Your browser does not support the video tag.