My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINAL ORDINANCE NO. 80-64
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
1990's
>
1992
>
FINAL ORDINANCE NO. 80-64
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:25:36 PM
Creation date
4/30/2015 9:44:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Permit R aui_rements: A Permit issued by the Zoning Adminis- <br />trator in conformity with the provisions of the Floodplain <br />Regulation shall be secured prior to the erection, addition, or <br />alteration of any building, structure, or portion thereof; prior <br />to the use or change of use of a building, structure, or land; <br />prior to the change or extension of a nonconforming use; and prior <br />to the placement of fill, excavation of materials, or the storage <br />of materials or equipment within the floodplain. <br />C. Application for Permit. Application for a Permit shall be <br />made in duplicate to the Zoning Administrator on forms furnished <br />by the Zoning Administrator and shall include the following where <br />applicable: plans in duplicate drawn to scale, showing the <br />nature, location, dimensions, and elevations of the lot; existing <br />or proposed structures, fill, or storage of materials; and the <br />location of the foregoing in relation to the floodplain. <br />D. State and Federal Permits. Prior to granting a Permit or <br />processing an application for a Conditional Use Permit or <br />Variance, the Zoning Administrator shall determine that the <br />applicant has obtained all necessary State and Federal Permits. <br />E. Certificate of Occupancy for a New. Altered, or Nonconforming <br />Use. It shall be unlawful to use, occupy, or permit the use or <br />occupancy of any building or premises or part thereof hereafter <br />created, erected, changed, converted, altered, or enlarged in its <br />use or structure until a Certificate of Occupancy shall have been <br />issued by the Zoning Administrator indicating that the use of the <br />building or land conforms to the requirements of the Floodplain <br />Regulation. <br />F. Construction and Use to be as Provided on Applications, <br />Plans. Permits. Variances and CertifinatAs of OcaUpdnay. Permits, <br />Conditional Use Permits, or Certificates of Occupancy issued on the <br />basis of approved plans and applications authorize only the use, <br />arrangement, and construction set forth in such approved plans and <br />applications, and no other use, arrangement, or construction. Any <br />use, arrangement, or construction at variance with that authorized <br />shall be deemed a violation of the Floodplain Regulation, and <br />punishable as provided by Section 303.110. <br />G. Certification. The applicant shall be required to submit <br />certification by a registered professional engineer, registered <br />architect, or registered land surveyor that the finished fill and <br />building elevations were accomplished in compliance with the <br />provisions of this ordinance. Flood -proofing measures shall be <br />certified by a registered professional engineer or registered <br />architect.
The URL can be used to link to this page
Your browser does not support the video tag.