Laserfiche WebLink
11 111 <br />REM W <br />CONTRACT FOR THE PUMPHOUSE NO. 4 AND CONNECTIN <br />WATERMAIN IMPROVEMENTS <br />WHET -EAS, pursuant to the current 2013-2014 Capital Improvement Plan the City is <br />constructing municipal water supply Well No. 4; and <br />WHEREAS, in order for proper operation and use of the well the City needs to design and <br />construct a pumphouse with trunk connecting watermain; <br />1. The City Engineer is hereby designated as the engineer for this improvement. The engineer shall <br />oversee the preparation of the Plans and Specifications for the making of such improvement. <br />2. The City Engineer shall retain the services of a consulting engineering firm., to assist, where <br />needed, to prepare Plans and Specifications for the making of such improvement and to assist the <br />City Engineer during the construction phase of the improvement as requested. <br />3. The Engineering Design and Construction Support Services contract is hereby approved as <br />recommended by the City Engineer. <br />4. The City Council declares its official intent to reimburse itself for the costs of the improvement <br />from the proceeds of tax exempt bonds. <br />(Seal) <br />0198=29 <br />Adam Bell % <br />City Clerk <br />Resolution No. 2013-61 <br />