My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2014-13 Savona 1st Add Final Plat
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2010's
>
2014
>
Resolution 2014-13 Savona 1st Add Final Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:37:01 PM
Creation date
3/25/2016 1:33:17 PM
Metadata
Fields
Template:
City Council
Document Type
Council Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5) A Common Interest Agreement concerning management of the common areas of Savona <br />and establishing a homeowner's association shall be submitted in final form to the <br />Community Development Director before a building permit may be issued for any <br />structure within this subdivision. The applicant shall also enter into a maintenance <br />agreement with the City that clarifies the individuals or entities responsible for any <br />landscaping installed in areas outside of land dedicated as public park and open. space on <br />the final plat <br />6) The applicant shall work with the City to determine the required park land dedication for <br />the entire Savona subdivision prior to the recording of the final plat. Any payments in <br />lieu of land dedication for the entire subdivision will be pro -rated based on the percentage <br />of the overall subdivision included in the final plat. <br />7) The landscape plan shall be reviewed and approved by an independent forester or <br />landscape architect prior to the City's final approval of the construction plans. <br />8) The applicant shall provide evidence that all conditions attached the Valley Branch <br />Watershed District permit for the final plat and associated grading work have been met <br />prior to the commencement of any grading activity, <br />9) The applicant must provide written authorization to perform the proposed work in the <br />Electrical Transmission easement areas prior to the release of the final plat for recording. <br />Work includes installation of stone sewer pipe, grading activities, and storm water <br />ponding. <br />10) The applicant shall provide evidence that Washington County has approved final <br />construction plans for all required work within the Keats Avenue right-of-way as <br />described in a letter from the County dated July 3, 2013. <br />11) The final construction plans related to the 5th Street Minor Collector road shall be revised <br />to be consistent with the City's design specifications for this road. These revisions shall <br />be reviewed in conjunction with the other changes requested by the City Engineer. <br />12) The final construction plans shall be revised to incorporate a multi-purpose trail within <br />the western portion of the Keats Avenue right-of-way and north of 5th Street consistent <br />with Washington County design specifications. <br />13) The final construction plans shall be revised to include the additional storm sewer <br />clements and street construction as specified in a review letter from the City Engineer <br />dated February 7, 2014. These revisions shall be reviewed in conjunction. with the other <br />changes requested by the City Engineer. <br />14) Jewel Avenue North shall be renamed Juniper Avenue on the final plat that is submitted <br />for recording. <br />
The URL can be used to link to this page
Your browser does not support the video tag.