Laserfiche WebLink
5) That the Village Park Preserve Preliminary Plat is consistent with the City's engineering <br />standards provided the plans are updated to address the City Engineer's comments <br />documented in a letter dated September 4, 2014. <br />6) That the Village Park Preserve Preliminary Plat provides effective and safe pedestrian <br />facilities, providing access to Reid Park and a future connection to downtown Lake Elmo, <br />contributing to a walkable community as guided by the Village Land Use Plan. <br />7) That the Village Park Preserve Preliminary Plat provides a significant expansion of Reid <br />Park, as recommended by the Village Land Use Plan. <br />8) That the Village Park Preserve residential subdivision will allow for the completion of the <br />Village Parkway minor collector road from 30th Street to Easton Village, providing a <br />critical transportation improvement needed for the Village Planning Area. <br />NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby <br />approve the Village Park Preserve Preliminary Plat subject to the following conditions: <br />1) The Metropolitan Council must approve the Comprehensive Plan Amendment for the <br />Holliday parcel in advance of the City's consideration of an application for Final Plat for <br />the Village Park Preserve Subdivision. <br />2) In advance of Final Plat application, the applicant shall provide adequate title evidence <br />satisfactory to the City Attorney. <br />3) All required modifications to the plans as requested by the City Engineer in a review <br />memorandum dated September 4, 2014 shall be incorporated into the plans prior to <br />consideration of a Final Plat. <br />4) The Preliminary Plat approval is conditioned upon the applicant meeting all minimum <br />City standards and design requirements. <br />5) The developer shall follow all of the rules and regulations spelled out in the Wetland <br />Conservation Act, and shall acquire the needed permits from Valley Branch Watershed <br />District prior to the commencement of any grading or development activity on the site. <br />6) Related to the proposed storm water discharge to the south, the applicant must provide <br />written permission from all property owners of the affected parcels located south of the <br />proposed 30th Street culvert consenting to the discharge location, volume and rate(s) in <br />advance of submitting Final Plat. <br />7) The applicant shall be responsible for the submission of final plans and the construction <br />of all improvements within the 30th Street right-of-way as required by the City and <br />further described in the review memorandum from the City Engineer dated September 4, <br />2014. <br />8) The applicant shall observe all right-of-way and other requirements included in a review <br />memorandum from Washington County dated September 3, 2014. <br />2 <br />Resolution 201474 <br />