My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2014-80 Receiving a Feasibility Report for the 2015 Street, Drainage and Watermain Improvements and Calling Hearing on Improvement
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2010's
>
2014
>
Resolution 2014-80 Receiving a Feasibility Report for the 2015 Street, Drainage and Watermain Improvements and Calling Hearing on Improvement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:36:57 PM
Creation date
3/25/2016 3:21:59 PM
Metadata
Fields
Template:
City Council
Document Type
Council Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF LAKE ELMO <br />WASHINGTON COUNTY <br />STATE OF MINNESOTA <br />RESOLUTION NO. 2014-80 <br />A RESOLUTION RECEIVING A FEASIBILITY REPORT FOR THE <br />2015 STREET, DRAINAGE AND WATERMAIN IMPROVEMENTS AND CALLING <br />HEARING ON IMPROVEMENT <br />WHEREAS, pursuant to city council authorization, adopted on July 1, 2014, a feasibility report <br />has been prepared by FOCUS Engineering, Inc. for the 2015 Street, Drainage and Watermain <br />Improvements; and <br />WHEREAS, the feasibility report recommends that benefitting properties along the project route <br />be assessed all or a portion of the cost of the improvements pursuant to the city's Special Assessment <br />Policy and Minnesota Statutes, Chapter 429; and <br />WHEREAS, the feasibility report provides information regarding whether the proposed <br />improvement is necessary, cost-effective, and feasible; whether it should best be made as proposed or in <br />connection with some other improvement; the estimated cost of the improvements as recommended; and a <br />description of the methodology used to calculate individual assessments for affected parcels. <br />NOW, THEREFORE, BE IT RESOLVED, <br />That the City Council has received the feasibility report; however, the City Council does not <br />authorize calling a public hearing at this time to consider the improvements in accordance with <br />the report and the assessments of the abutting properties for all or a portion of the cost of the <br />improvements pursuant to Minnesota Statues, Chapter 429 at an estimated total project cost of <br />$1,843,000 for the street and drainage system improvements and an estimated total project <br />cost of $1,056,000 for the watermain improvements. <br />2. If at a future date, the Council elects to move forward with the improvements, a public hearing <br />shall be held on such proposed improvements at a time and date to be specified and the clerk shall <br />give mailed and published notice of such hearing and improvement as required by law. <br />ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTH DAY OF OCTOBER, <br />2014. <br />CITYELM <br />i <br />Mike Pearson <br />Mayor <br />(Seal) <br />ATTEST: <br />Adam Bell <br />City Clerk <br />Resolution No. 2014-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.