My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-06-2011 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2010's
>
2011
>
12-06-2011 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2025 8:25:52 PM
Creation date
8/1/2017 12:01:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES APPROVED January 3, 2012 <br />MOTION: Council Member Smith moved to approve Resolution No. 2011-61 approving <br />a Conditional U.se Permit Amendment based on the nine conditions stated and Resolution <br />No. 2011-062 approving variances for Christ Lutheran Church at 11194 36`h Street <br />North to expand its current facility and make other improvements to the property. <br />Council Member Park seconded the motion. The motion passed 5-0. <br />DeMontreville-Highlands Area Street Improvements — Authorize the Preparation of the <br />Feasibility Report <br />The City Council considered initiating the 2012 Street Improvement Project by <br />authorizing FOCUS Engineering, Inc. to prepare the DeMontreville Highlands Area <br />Street Improvements Feasibility Report in the Lump Sum amount of $9,600.The study <br />will report on the feasibility of the improvements and the estimated project costs to <br />reclaim or construct each street segment, depending on the existing street conditions and <br />findings from the geotechnical investigation which is already in process. During the <br />study potential rain garden locations will be identified and residents will be encouraged <br />to consider the placement of a rain garden within the right-of-way boulevard adjacent to <br />their property. <br />MOTION: Council Member Pearson moved to authorize FOCUS Engineering, Inc. to <br />prepare the Feasibility Report for the DeMontreville Tlighlands Area Street <br />Improvements in the amount of',59, 600. Council Member Smith seconded the motion. <br />The motion passed 5-0. <br />Kirkwood Avenue Street Improvements -- Accept Petition and Authorize Feasibility <br />Report <br />The City Council considered adopting a resolution Declaring Adequacy of Petition and <br />Ordering the Preparation of the Feasibility Report for Street Improvements for Kirkwood <br />Avenue North, On April 26, 2011 a petition was received to improve Kirkwood Avenue <br />North from a gravel roadway to a paved roadway. <br />City Engineer Griffin reported Kirkwood Avenue North is not programmed for <br />improvement in the 2011-2015 Street CIP. Therefore this improvement has not been <br />previously presented to the Council as a planned improvement or budget item. The <br />estimated cost to complete the feasibility report is $5,200. Should the project be <br />constructed and assessed to the benefitting properties, the City share for the various <br />improvements is estimated to be $45,000 if a lower cost shape and pave improvement is <br />feasible. If a reconstruction is required, the more likely scenario, the City share is <br />estimated to be $120,000. <br />MOTION: Mayor Johnston moved to direct the city engineer to continue working on <br />scenarios and come back within a year with a recommendation, but also continue <br />dialogue with affected residents with the assistance of'Council. Member Park. Council <br />Member Pearson seconded the motion. The motion passed 5-0. <br />LAKE ELMO CITY COUNCIL MINUTES DECEMBER 6, 2011. <br />
The URL can be used to link to this page
Your browser does not support the video tag.