My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-2004 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2004
>
02-17-2004 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 8:47:45 AM
Creation date
8/7/2017 10:49:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAKE ELMO CITY COUNCIL MINUTES FEBRUARY 27, 2004 4 <br /> <br /> <br />7. MAINTENANCE/PARK/FIRE/BUILDING: <br />A. Parks Dept. Score Board Donation <br />At its January 17, 2004 Parks Commission meeting, Commissioner Bruchu presented a <br />proposal for an anonymous donation of two electronic scoreboards that would be <br />installed at both the Lions and VFW ball fields. A motion was passed to recommend <br />acceptance of the donations with the understanding that the City would be responsible for the maintenance and installation, if the costs were under $1,000 each. <br /> <br />Mike Bouthilet reported that the Parks Department checked on pricing for installation, <br />which includes trenching, materials and an electrical contractor. Not including City <br />labor, both scoreboards can be installed at a total cost of $278.00. <br />M/S/P Dunn/Siedow – to accept the scoreboard donation and send a thank you letter to <br />the anonymous donor of scoreboards for VFW and Lions Parks; and, authorizing City <br />Staff to purchase such materials and services as are necessary for installation of the <br />scoreboards. (Motion passed 5-0). <br />Mayor Hunt congratulated the Acting Public Works Supervisor and his crew on how well <br />the snowplowing went this winter season. <br /> <br />B. Building Dept. Update : Jim McNamara <br />The Building Official reported there were no new residential permits, nor new <br />commercial permits issued for January 2004. <br /> <br />8. CITY ENGINEER’S REPORT: A. Resolution No. 2004-015 2004 Overlay Feasibility Report and Call a <br />Public Hearing <br /> <br />The City Engineer provided the Feasibility Report for the 2004 Overlay Project: 49th <br />Street N., Jane Circle N., Jasper Avenue N., and Jerome Avenue N. Council member DeLapp asked if the City could find the cost implications of cutting 8’ out of one side of <br />the street to make the streets narrower, because these are 32’ wide streets. He also asked <br />that the City Engineer look into curb placement, tree planting with possible bump outs to <br />control speed. Mayor Hunt suggested that the Council could ask the residents what they <br />think of this idea at the public hearing. <br />M/S/P Johnston/Siedow – to adopt Resolution No. 2004-015, A Resolution Receiving the <br />Feasibility Report and Calling a Hearing on the 2004 Overlay Project. (Motion passed 5- <br />0). <br />
The URL can be used to link to this page
Your browser does not support the video tag.