My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2016-008
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2010's
>
2016
>
Resolution 2016-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 12:14:59 PM
Creation date
8/8/2017 10:58:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01"VOK41 <br />A RESOLUTION ORDERING PREPARATION OF A FEASIBILITY <br />REPORT FOR THE OLD VILLAGE PHASE 2 STREET, DRAINAGE, AND <br />UTI I LITY IMPROVEMENTS <br />WHEREAS, the City of Lake Elmo and Washington County have entered into a <br />Cooperative Agreement to jointly make Street, Drainage and Utility Improvements to City and <br />County infrastructure in and around the Old Village area in downtown Lake Elmo; and <br />WHEREAS, the improvements are being completed in two phases with Old Village <br />Phase I consisting of a portion of the City streets including Upper 33 Street North and Laverne <br />Avenue North, and including the construction of the Regional Infiltration Pond; and the Old <br />Village Phase 2 consisting of CSAH 17 (Lake Elmo Avenue) from CSAH 14 (Old Hwy 5) to <br />30th Street, and 30"' Street from CSAH 17 east to the Reid Park lift station; and <br />WHEREAS, the Old Village Phase 1 Improvements began construction in 2015 and the <br />Old Village Phase 2 Improvements are proposed for construction beginning in 2016; and <br />WHEREAS, each entity is responsible for sharing in the project costs per Cooperative <br />Agreement No. 9660, dated June 2015; and <br />WHEREAS, the Phase 2 Irnprovements includes street, drainage and utility <br />improvements, including the extension of sanitary sewer service and replacement of aging <br />watennain infrastructure along the following corridors; <br />* 30' Street North, ftom, the Reid Park lift station to Lake Elmo Avenue. <br />* Lake Elmo Avenue, from 3e Street North to CSAH 14. <br />WHEREAS, it is proposed to assess the benefiting properties for all or a portion of the <br />cost of the improvement, pursuant to the City's Special Assessment Policy and Minnesota <br />Statues, Chapter 429. <br />That the proposed improvement, called the Old Village Phase 2 Street, Drainage, and Utility <br />Improvements, be referred to the City Engineer and FOCUS Engineering, and that FOCUS <br />Engineering is instructed to complete a feasibility report in accordance with Minnesota Statues, <br />Chapter 429 for the proposed improvements, and to report to the council with all convenient <br />speed advising the council in a preliminary way as to whether the proposed improvement is <br />necessary, cost-effective, and feasible; whether it should be best made as proposed or in <br />connection with some other improvement; using estimated costs for the recommended <br />
The URL can be used to link to this page
Your browser does not support the video tag.