My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINAL ORDINANCE NO. 08-147
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
2010's
>
2016
>
FINAL ORDINANCE NO. 08-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:30:41 PM
Creation date
8/8/2017 1:40:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />due to an increase in the estimated cost of the building or structure have been paid. <br /> <br /> (C) Plan review fees shall be 65 percent of the building permit fee. Investigation fees for <br />work started without a permit shall be equal to the permit fee. <br /> <br /> (D) Plan review fees for similar plans shall be 25 percent of the normal building permit fee. <br /> <br /> (E) The plan checking fee shall be paid by the applicant to the city. <br /> <br /> (F) Permits shall be required for moving structures within, out, or through the city. <br />Structure moving permit fees shall be as established by the city’s fee schedule. <br /> <br /> (G) An escrow administration fee in an amount established the city’s fee schedule shall be <br />paid before a permit is issued for all permits requiring escrow in accordance with Section <br />151.022 of this Code. <br /> <br />SECTION 4. The City Council of the City of Lake Elmo hereby amends Section 151.015 of the <br />City Code by deleting the stricken language and adding the underlined language as follows: <br />§ 151.015 GENERALLY. <br /> <br /> (A) Permits required. No person, firm, or corporation shall erect, construct, enlarge, alter, <br />repair, move, improve, remove, convert, or demolish any building or structure in the city or <br />cause these actions to be done without first obtaining a separate building permit for each building <br />or structure as required by the State Building Code as adopted by this chapter. <br /> <br /> (B) Fees established. <br /> <br /> (1) Fees shall be as provided by City Council ordinance, as amended from time to <br />time, and shall be attached as Appendix A of the code. <br /> <br /> (2) (a) The Building Official shall utilize the chart of estimated construction costs as <br />annually provided by the Minnesota Department of Administration Labor and Industry, State <br />Building Codes and Standards Division Building Codes and Standards Unit, to compute building <br />valuations for the purposes of establishing the permit fees of the city. <br /> <br /> (b) Specific fees are set forth from time to time by resolution of the City Council. <br /> <br /> (C) Double fee. If any construction is undertaken in the absence of a permit required by this <br />code to be issued as a prerequisite to building construction, the permit fee shall be double the <br />stated amount. <br /> <br /> (D) Building demolition fees. All building or structures prepared for demolition within the <br />city require a demolition permit. <br /> <br /> (E) Surcharge. In addition to the permit fees required, the applicant shall pay a surcharge <br />to be remitted to the Minnesota Department of Administration as prescribed by M.S. § 16B.70,
The URL can be used to link to this page
Your browser does not support the video tag.