My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINAL ORDINANCE NO. 08-152
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
2010's
>
2016
>
FINAL ORDINANCE NO. 08-152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:30:41 PM
Creation date
8/8/2017 1:40:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13. Easements and rights -of -way within or adjacent to the subdivision parcel(s); <br />14. The location and orientation of proposed buildings; <br />15. Proposed sidewalks and trails; <br />16. Vehicular circulation system showing location and dimension for all driveways, <br />parking spaces, parking lot aisles, service roads, loading areas, fire lanes, <br />emergency access, if necessary, public and private streets, alleys, sidewalks, bike <br />paths, direction of traffic flow and traffic control devices; <br />17. Lighting location, style and mounting and light distribution plan. <br />18. Proposed parks, common areas, and preservation easements (indicate public vs. <br />private if applicable); <br />19. Location, access and screening detail of large trash handling and recycling <br />collection areas <br />(iii) Proposed architectural theming and performance standards for the development; <br />(iv) A grading drainage and erosion control plan prepared by a registered professional <br />engineer providing all information as required by Public Works, the City Engineer, <br />and/or the Director of Planning; <br />(v) A utility plan providing all information as required by Public Works, the City <br />Engineer, and/or the Director of Planning; <br />(vi) Results of deep soil test pits and percolation tests, at the rate of no fewer than 2 <br />successful test results for each proposed septic disposal area; <br />(vii) The location and detail of signage providing all pertinent information necessary to <br />determine compliance with § 154.212; <br />(viii) A tree preservation plan as required by § 154.257; <br />(ix) A landscape plan, including preliminary sketches of how the landscaping will look, <br />prepared by a qualified professional providing all information outlined in § 154.258; <br />(x) A traffic study containing, at a minimum, the total and peak hour trip generation from <br />the site at full development, and the effect of such traffic on the level of service of <br />nearby and adjacent streets, intersections, and total parking requirements; <br />(xi) A plan sheet or narrative clearly delineating all features being modified from <br />standard open space PUD regulations; <br />(xii) Common Interest Community Association documents including bylaws, deed <br />restrictions, covenants, and proposed conservation easements. <br />(xiii) Any other information as directed by the Director of Planning. <br />(e) PUD Preliminary Plan Review <br />(i) As part of the review process for an open space PUD Preliminary Plan, the Director <br />of Planning shall generate an analysis of the proposal against the expectations for <br />PUDs, and make a recommendation regarding the proposed overlay district for <br />Page 18 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.