Laserfiche WebLink
Resolution 97-108 <br />Adopted 5/7/02 <br />f. Performance Standard — Accessory Structures <br />All Accessory Structures shall comply with the Exterior Surfacing <br />requirements specified by this subdivision. <br />g. Performance Standard — HVAC Units and Exterior <br />Appurtenances <br />All exterior equipment, HVAC and trash/recycling and dock areas <br />shall be screened from view of the Public with the primary exterior <br />materials used on the principal structure. <br />h. Performance Standard — Visible Roofing Materials <br />Any roofing materials that are visible from ground level shall be <br />standing seam metal, fire -treated cedar shakes, ceramic tile, clay tile, <br />concrete or slate. <br />Applicability — New Construction <br />The standards of this subdivision shall be applicable to all structures <br />and buildings constructed in the City, on and after the effective date of <br />this subdivision. The performance standards of this subdivision shall <br />not be in any manner minimized by subsequent Planned Unit <br />Development Plans or Agreement. <br />Section 2. Effective Date: This ordinance shall become effective upon its passage and <br />publication according to law. <br />Lee Hunt, Mayor <br />Attest <br />gxz�tt <br />Mary Kueffner, &ty Clerk/Administrator <br />Adopted by the Lake Elmo City Council on the 7" day of May, 2002. <br />Summary published in the Stillwater Gazette on the day of , 2002. <br />