Exhibit C <br />Ramsey/Washington Upgrade Construction Schedule <br />Descriut on of Work <br />Engineering Walkout <br />Engineering Design <br />Commencement of Permitting <br />Fiber Optic Cable Introduction <br />Node Installation <br />Amplifier Replacement <br />Passive Equipment Replacement <br />System Balancing and Proof -of -Performance <br />Activation in Phases; completion by <br />Time Fkaffie <br />0-9 months <br />3-12 months <br />Day 75 <br />10-18 months <br />10-36 months <br />12-24 months <br />18-36 months <br />36 months <br />May 30, 2001 <br />Actual construction will begin at the hub locations, which are currently located <br />at our office sites in White Bear Lake and Oakdale. The hubs themselves will be <br />upgraded and will be interconnected via SONEC architecture between themselves and <br />all other hubs served by the Company in the Twin Cities area. Fiber will be <br />introduced into the coaxial network radiating out from the hub locations and moving <br />throughout each community from there. <br />Electronic active and passive equipment, power supplies, etc. will be replaced <br />and/or installed on a node -by -node basis. Activation of new plant will be done on a <br />node -by -node basis, <br />Due to the difficult winter construction season, fiber duct and pedestals may <br />be installed and/or replaced during summer and fall months. This work would occur <br />throughout the entire franchise area to allow winter work to be done in more than Just <br />aerial locations, <br />