My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINAL ORDINANCE NO. 97-050
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
1990's
>
1999
>
FINAL ORDINANCE NO. 97-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:27:21 PM
Creation date
8/11/2017 2:48:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit F <br />End -to -End Fiber Connection and Usage Policies <br />for I -Net <br />tal Cow^action to Institutional NetWV <br />All I -Net connections existing and required in the current franchise shall remain <br />required. In addition, all institutions designated on Exhibit E shall be connected to <br />the Institutional Network along with any new or relocated city hall which may be <br />constructed by a member municipality or to which a member municipality may <br />otherwise move its government offices or council meeting locations. Other public or <br />educational institutions subsequently designated by a member municipality shall be <br />connected to the institutional Network if the designated institution is located less than <br />five hundred (500) feet from the existing Institutional Network, or if such designated <br />institution agrees to reimburse Company for Company's actual costs in excess of the <br />five hundred (500) foot installation actual costs. <br />Member Municipalities. <br />A building to node fiber connection and drop shall be accomplished without <br />charge to any city hall/township hall which requests such connection. All other <br />municipal buildings shall be connected to the nodes with a fiber connection and drop <br />upon request of the municipality and upon agreement to reimburse the Company for <br />all costs associated with such connection. In the event Company extends the <br />Institutional Network with a fiber connection from any node to any municipal building <br />without cost to that member municipality, then other subsequent request from the <br />member municipality shall be complied with pursuant to those same "without cost" <br />terms. <br />Other Public Institutions. <br />All other public institutions shall be connected to the node with a fiber <br />connection and drop upon request of such institution and upon agreement to <br />reimburse the Company for all costs associated with such connection. In the event <br />Company extends the Institutional Network with a fiber connection from any node and <br />any other public institution without cost to that public institution, then any <br />subsequent request from that institution shall be complied to pursuant to those same <br />"without cost" terms. <br />Business Community. <br />In accordance with the Company's policies for service to the business <br />community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.