Laserfiche WebLink
H. City Review. The City shall review and approve all parts of the system design and <br />associated plans prior to any construction taking place. Once approval of the system is <br />given, a permit shall be issued by the City. <br />Subd.4 Construction. <br />A Sanitary Sewers. All sanitary sewers shall be constructed and tested in accordance <br />with the City Engineers Association of Minnesota Standards for Utility Construction. <br />B. Treatment Cells - Testinn. Liners of treatment cells shall be visually inspected for <br />tears, holes, or poor seams prior to placing rock. A leak test shall be performed after the <br />rock is in placed. The liner shall be uncovered, repaired and the test rerun if any leaks <br />show up during this testing. <br />A City representative shall be present for all treatment cell testing. <br />C. Turf Establishment/ Plant Growth. The Designer shall prepare a vegetation plan to <br />establish a wetland community over the treatment cells. <br />Prior to final acceptance, wetland plants shall display vigorous growth, and turf shall be <br />established outside of the treatment cell area. No erosion shall be present on the site. <br />D. Certification. The system designer shall certify in writing to the City that the <br />treatment system has been constructed in accordance with the approved plans and <br />specifications, and that all test requirements have been met. This certification must be <br />received before start-up of the system. <br />