Laserfiche WebLink
700.05 Administration. <br />Subd. 1 Applicability, <br />A. This section shall apply and be in effect for the stated purposes within the City. <br />B. Enforcement. <br />1. The zoning administrator shall be responsible for administration and enforcement of this section. <br />2. The zoning administrator or administrator's agent shall be qualified and certified by the NVCA as <br />competent in the design, evaluation and inspection of individual on -site sewage treatment systems. <br />C. Board of Adjustment and Appeals. <br />1. The board of adjustment and appeals shall hear and decide appeals and review any order, decision <br />or determination made by the zoning administrator regarding the enforcement of this section. <br />2. They shall hear and act upon all variance requests where provisions of the ordinance are <br />specifically variable. <br />3. An appeal of an administrative decision or determination may be filed by any person, department, <br />bureau, town, city, county or state. <br />D. Permits shall be required for sewage treatment systems as follows: <br />1. All new installations of sewage tanks, treatment systems and components of the sewage tanks or <br />systems, <br />2. All repair, extension, replacement or modification of existing systems and components. <br />3. Permits shall not be required for normal routine inspection and maintenance of systems. <br />4. No building permit shall be issued for construction, alteration, expansion or remodeling of any <br />dwelling or other establishment served by an on -site treatment system until the permit required for <br />the treatment has first been issued. <br />5. Where work requiring a permit under this section has been commenced without first having <br />obtained a permit, work shall be ordered to stop until the permit requirement has been satisfied. <br />E. Inspections. As required to determine compliance with this section, inspections shall be performed by <br />the zoning administrator or administrator's authorized agent under the following circumstances: <br />1. Site inspections to verify and evaluate soil and site conditions and to determine suitability of soils <br />and system design. <br />2. Installation inspections shall be made at each installation, prior to any work having been covered <br />by backfill. <br />a. The applicant shall be responsible to notify the zoning administrator a minimum of twenty- <br />four hours prior to the time work is ready for inspection or re inspection. <br />