Laserfiche WebLink
B. If special testing required by Grantor establishes that System is in compliance <br />with prescribed technical standards, Grantor shall bear all costs of the special <br />testing. <br />C. Grantor shall bear all costs of any other special testing required by Grantor. <br />ARTICLE 6. CONSTRUCTION PROVISIONS <br />6.01 Construction Timetable. Company's construction timetable (submitted in <br />conjunction with a map for the initial service area and made a part of the Franchise) reflects <br />the method and schedule of construction of System. The plan of Company will reflect at <br />a minimum the following: <br />A. Within 90 days of the granting of the Franchise, Company shall apply for all <br />necessary governmental permits, licenses, certificates and authorizations. <br />B. All engineering and design shall be completed within one year after the <br />granting of the Franchise. <br />C. A significant amount of construction shall be completed within one year -after <br />Company's receipt of all necessary governmental permits, licenses, certificates <br />and authorizations. <br />D. Energized trunk cable shall be extended substantially throughout the <br />authorized area within five years after commencement of construction. <br />Persons along the route of the energized cable will have individual "drops" <br />within the same period of time, if the same is desired. <br />E. Construction of the initial service area shall be completed within three (3) <br />years of certification by Board. <br />11 <br />