My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINAL ORDINANCE NO. 08-185
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
2010's
>
2017
>
FINAL ORDINANCE NO. 08-185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:30:51 PM
Creation date
9/7/2017 8:48:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0§ 94.60 MAPPING DATA. <br /> (A) Information required. Each year, registrant and permittee shall provide mapping <br /> information required by the city in accordance with Minnesota Rules Parts 7819.4000 and <br /> 7819.4100. Within 90 days following completion of any work pursuant to a permit, the <br /> permittee shall provide the Administrator with accurate maps and drawings certifying the <br /> "as-built" location of all equipment installed, owned and maintained by the permittee. <br /> Such maps and drawings shall include the horizontal and vertical location of all facilities <br /> and equipment and shall be provided consistent with the city's electronic mapping <br /> system, when practical or as a condition imposed by the Administrator. Failure to <br /> provide maps and drawings pursuant to this subsection shall be grounds for revoking the <br /> permit holder's registration. <br /> (B) Service laterals. All permits issued for the installation or repair of service laterals, other <br /> than minor repairs as defined in Minnesota Rules Part 7560.0150 subpart 2, shall require <br /> the permittee's use of appropriate means of establishing the horizontal locations of <br /> installed service laterals and the service lateral vertical locations in those cases where the <br /> Administrator reasonably requires it. Permittees or their subcontractors shall submit to the <br /> Administrator evidence satisfactory to the Administrator of the installed service lateral <br /> locations. Compliance with this subdivision and with applicable Gopher State One Call <br /> law and Minnesota Rules governing service laterals installed after December 31, 2005 <br /> shall be a condition of any city approval necessary for: <br /> (1) payments to contractors working on a public improvement project including those <br /> under M. S. Chapter 429 <br /> (2) city approval under development agreements or other subdivision or site plan <br /> approval under M. S. Chapter 462. The Administrator shall reasonably determine the <br /> appropriate method of providing such information to the city. Failure to provide <br /> prompt and accurate information on the service laterals installed may result in the <br /> revocation of the permit issued for the work or future permits to the offending <br /> permittee or its subcontractors. <br /> (Ord. 9756,passed 6-20-2000) Penalty, see 4 10.99 <br /> Q§ 94.61 LOCATION OF FACILITIES. <br /> Placement, location, and relocation of facilities must comply with the Act, with other applicable <br /> law, and with Minnesota Rules Parts 7819.3100, 7819.5000 and 7819.5100, to the extent the <br /> rules do not limit authority otherwise available to cities. <br /> (A) Undergrounding. Unless otherwise permitted by an existing franchise, or other <br /> agreement, or unless existing above-ground facilities are repaired or replaced, new construction <br /> and the installation of new facilities and replacement of old facilities shall be done underground <br /> or contained within buildings or other structures in conformity with applicable codes. <br /> (B) Corridors. <br /> (1) The city may assign specific corridors within the right-of-way, or any particular segment <br /> thereof as may be necessary, for each type of facility that is or, pursuant to current technology, <br /> the city expects will someday be located within the right-of-way. All excavation, obstruction, or <br /> other permits issued by the city involving the installation or replacement of facilities shall <br /> designate the proper corridor for the facilities at issue. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.