My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 5, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
July 5, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 11:54:42 AM
Creation date
10/1/2019 3:19:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Storm Sewer. Storm sewer improvements include all necessary <br />storm sewers, catch basins, culverts, and other apparatus. Storm <br />sewer improvements shall be completed by the 301h day of <br />November, 2006. <br />D. Street Improvements. Street improvements include subgrade <br />preparation, gravel base, bituminous surfacing, bituminous curb <br />and concrete curbs, where required. <br />Unusable material within the roadway shall be removed by <br />the Developer. <br />All subgrade excavation and filling shall be completed by <br />the Developer in accordance with MNDOT's specifications. <br />The City reserves the right to test as necessary, at the <br />Developer's expense, all grading work. A test roll of the <br />street subgrade shall be passed prior to acceptance of the <br />subgrade by the City. <br />Subgrade and the initial course of street improvements <br />shall be completed by the 1st day of July, 2007. The final <br />wear course of the street shall be completed by the 1st day <br />of July, 2008. <br />E. Waste Water Treatment System/Drain Field. The waste water <br />treatment system/drain field shall be comprised of a series of <br />pipes, septic tanks, treatment ponds, drain fields and <br />appurtenances, and shall be completed prior to the issuance of <br />any certificates of occupancy. <br />F. Street Signs. The City will order and install street signs. The <br />Developer shall pay for all costs incurred by the City. <br />G. Water Main. Water main improvements include pipes, hydrants <br />and appurtenances and shall be completed on or before the 30th <br />day of November, 2007. Developer is over -sizing water mains and <br />the City shall reimburse Developer in the amount of $38,785 <br />for such over -sizing. <br />4.02 Estimated Cost of Developer Secured Improvements. The estimated <br />costs of Developer constructed improvements are as follows: <br />Improvement <br />Estimated Cost <br />Site Grading/Turf Restoration Valley Branch <br />2 <br />