My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
June 20, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
June 20, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 12:07:05 PM
Creation date
10/1/2019 3:19:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ incorporating it into the existing gravel base. Subgrade repairs will be made where <br />necessary. <br />The new streets would be repaved with 1-1/2 inches of bituminous base (including <br />bituminous curb) and 1-1/2 inches of bituminous wear course for Irvin Court, Irvin Circle, <br />Isle Avenue, and Ivy Court. <br />The same process is proposed for Jamaca Court, except there will not be any bituminous <br />curb placed on this street. Also, the existing turn -around will be enhanced within the <br />constraints of the existing right-of-way. <br />The new surface will be saw cut and sealed to prevent new random cracks from <br />developing prematurely. <br />In order to preserve existing lawns and minimize restoration costs, new streets with <br />bituminous curb will be somewhat narrower than the existing streets. Restoration with <br />topsoil seed and wood fiber blanket will be done after the street is paved. <br />This Project will extend the life of the streets an additional 15 to 20 years. <br />IV. PERMITS AND APPROVALS <br />A Pollution Control Agency (MPCA) permit for erosion control is required. <br />V. ESTIMATED PROJECT COSTS <br />_ The prices quoted herein are estimates only. The actual cost of the work will be <br />determined through the public bidding process. A detailed cost estimate is located in the <br />Appendix. <br />Item Estimated Cost <br />Estimated Construction Cost $ 189,250.00 <br />Indirect Costs $ 25,000.00 <br />Estimated Project Cost $ 214,250.00 <br />2 13688.000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.