Laserfiche WebLink
JUN-15-2006 15:31 TKDA <br />TKDA RECEIVED <br />ENGINEERS • ARCHITECTS - PLANNERS <br />MEMORANDUM <br />To: Lake Elmo City Council Reference: <br />Copies To: <br />proj. No,: <br />From: Thomas Prew, P. E. Routing: <br />Date: June 15.2006 <br />651 292 0083 P.01 <br />1500 Piper daffray Plain <br />444CedarStreet -.----� <br />Saint Paul, MN 55101.2140 <br />(651)292-4400 <br />(651) 292-0069 Fax <br />viww.tkda.00m <br />Change Order No_ 1R <br />Elevated Storage Tank No. 2 <br />City of Lake Elmo, Minnesota <br />13253.000 <br />Attached is a signed Change Order from the Contractor for additional work on the water tower project. <br />The change is for a revised conduit routing, size, and number of conduits between the tower and the Public <br />Works building. The revised route saves money by reducing the cost of running conduit inside of the <br />building. <br />We have reviewed it and recommend approval of it. <br />An Employee Owned Company Promoting Affirmative Man and Equal Opportunity <br />