Laserfiche WebLink
JUN-15-2006 16:18 TKDR <br />ESTIMATE NO.5 <br />651 292 0083 P.03 <br />PERIOD ENDING: June 1. 2D06 <br />WATER SYSTEM INTERCONNECT - PHASE i <br />CITY OF LAKE EL MO, MINNESOTA <br />TKDR PROJECT NO. 13186,000 <br />ITEM <br />CONTRACT QUANTITY <br />UNIT <br />AMOUNT <br />NO. <br />DESCRIPTION <br />UNIT <br />QUANTITY <br />TO DATE <br />PRICE <br />TO DATE <br />BASE BID <br />1 <br />MOBILIZATION <br />LS <br />1.0 <br />1.0 <br />S <br />15,000.00 <br />$ <br />15,DOD.00 <br />2 <br />REMOVE & DISPOSE OF BIT. PAVEMENT <br />SY <br />210.0 <br />66,0 <br />$ <br />5.00 <br />$ <br />330.00 <br />3 <br />SAW CUT BIT. PAVEMENT <br />LF <br />75.0 <br />71.0 <br />$ <br />1.00 <br />S <br />71.00 <br />4 <br />PATCH BIT. PAVEMENT 4" THICK <br />BY <br />210.0 <br />66.0 <br />$ <br />18.DO <br />S <br />1,188.00 <br />5 <br />REMOVE & REPLACE CMP CULVERT <br />LF <br />70.0 <br />30.0 <br />$ <br />12.00 <br />S <br />36000 <br />6 <br />SEEDING, INCL. SEED, FERTILIZER & WOOD FIBER BLANKET <br />BY <br />9DOX <br />600.0 <br />$ <br />1,50 <br />$ <br />900.00 <br />7 <br />SODDING TYPE LAWN <br />SY <br />200.0 <br />- <br />$ <br />2.50 <br />$ <br />- <br />6 <br />CL-5 <br />TN <br />30.0 <br />119.0 <br />$ <br />9.00 <br />$ <br />1,D71-00 <br />9 <br />BIT. PAVEMENT FOR DRIVEWAY 2" DEPTH <br />TN <br />154,0 <br />181.12 <br />$ <br />50,00 <br />$ <br />9,056.00 <br />10 <br />CONNECT TO EXIST. WATERMAIN <br />EA <br />1.0 <br />1.0 <br />S <br />1.200.00 <br />S <br />1,200.00 <br />11 <br />6" DIP CL-52 WATERMAIN <br />LF <br />42.0 <br />24.0 <br />$ <br />33.52 <br />S <br />811.68 <br />12 <br />8" DIP CL 50 WATERMAIN <br />LF <br />16.0 <br />12.0 <br />$ <br />45.80 <br />S <br />560.32 <br />13 <br />DIP. DRILL 16" (DIP) HOPE DR 17 <br />LF <br />6,649.0 <br />6,649.0 <br />$ <br />40.48 <br />$ <br />269.151.52 <br />14 <br />6" RES. SEAT GATE VALVE & BOX <br />EA <br />6.0 <br />7.0 <br />$ <br />W8A2 <br />$ <br />5,218.94 <br />15 <br />8' RES- SEAT GATE VALVE & BOX <br />EA <br />1.0 <br />1.0 <br />S <br />1,179.32 <br />S <br />1,179.32 <br />16 <br />16" BUTTERFLY VALVE & BOX <br />EA <br />4.0 <br />5.0 <br />$ <br />2,610.91 <br />S <br />13,054.55 <br />17 <br />6" HYDRANT (T-6" BURY) <br />EA <br />6,0 <br />7.0 <br />$ <br />2,720.14 <br />S <br />19,040.98 <br />18 <br />MJ DIP COMPACT FITTINGS <br />LB <br />4,109-0 <br />907.0 <br />$ <br />3-00 <br />$ <br />2,721.00 <br />19 <br />TYPE LV3 BIT -NON -WEAR COURSE MIXTURE <br />TN <br />- <br />- <br />S <br />S <br />- <br />20 <br />TYPE LV•4 BIT. WEAR COURSE MIX <br />TN <br />- <br />181.0 <br />$ <br />- <br />5 <br />_ <br />21 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GA <br />- <br />- <br />$ <br />- <br />S <br />- <br />22 <br />TOPSOIL BORROW <br />CY <br />- <br />130.0 <br />$ <br />- <br />S <br />- <br />23 <br />SODDING <br />SY <br />- <br />$ <br />$ <br />TOTAL ESTIMATE N0.5 <br />S 3411SM31 <br />TOTAL P.03 <br />