My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 16, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
May 16, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 1:11:35 PM
Creation date
10/1/2019 3:19:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Grading Improvements shall be completed on or before <br />the 30th day of November, 2006. <br />2. Turf restoration improvements shall be completed on or <br />before the 30tht day of November, 2007. <br />Landscaping. Developer shall complete at[ landscaping <br />improvements on or before the 30t day of November, 2007. <br />C. Storm Sewer. Storm sewer improvements include all necessary <br />storm sewers, catch basins, culverts, and other apparatus. Storm <br />sewer improvements shall be completed by the 301h day of <br />November, 2006. <br />D. Street Improvements. Street improvements include subgrade <br />preparation, gravel base, bituminous surfacing, bituminous curb <br />and concrete curbs, where required. <br />1. Unusable material within the roadway shall be removed by <br />the Developer. <br />2. All subgrade excavation and filling shall be completed by <br />the Developer in accordance with MNDOTs specifications. <br />The City reserves the right to test as necessary, at the <br />Developer's expense, all grading work. A test roll of the <br />street subgrade shall be passed prior to acceptance of the <br />subgrade by the City. <br />3. Subgrade and the initial course of street improvements <br />shall be completed by the 30th day of November, 2006. The <br />final wear course of the street shall be completed by the <br />30th day of November, .2007. <br />E. Waste Water Treatment System/Drain Field. The waste water <br />treatment system/drain field shall be comprised of a series of <br />pipes, septic tanks, treatment ponds, drain fields and <br />appurtenances, all located on Outlot A of the Subdivision. <br />Developer shall be responsible for installing the wastewater <br />treatment system/drain field, which installation shalt be <br />completed prior to the issuance of any certificates of occupancy. <br />The wastewater treatment system/drain field shall be the only <br />improvement installed by Developer on Outlot A. All other <br />improvements on Outlot A shall be installed by the developer of <br />the Residential Subdivision pursuant to the Development <br />Agreement for the Residential Subdivision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.