My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
May 2, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 10:05:02 AM
Creation date
10/1/2019 3:19:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. NEW BUSINESS: <br />None <br />7. MAINTENANCE/PARK/FIRE/BUILDING: <br />A. Update on Building Dept.: Jim McNamara <br />Building Official McNamara updated Staff that Washington County Park Reserve had <br />been issued a permit for a new Picnic Shelter and Restroom area. The Building Dept. <br />continues to remove illegal signs. He stated, again, that portable basketball hoops are <br />illegally being placed in the street, which is illegal and very dangerous to children. <br />B. Fire Dept. Updates: Chief Mahnquist <br />None <br />8. CITY ENGINEER'S REPORT: <br />A. Resolution 2006-035: Re: <br />trans ror me /uvo 3ireei 1C MW2 i —I UUIYU rtti 1 <br />City Engineer Prew summarized the Feasibility P <br />Tablyn Park Neighborhood. He would like to pr( <br />May 16-award bid; July 2006-start work; August <br />Mayor Johnston opened the Public <br />Daniel Novak, 8520 Ironwood Trail N., had <br />�: . <br />assessment repayment; water ando'" consi <br />curb and height; undergroun4,.,466tricity <br />for the 2006 Street Repairs — <br />as follows: May 12-open bids; <br />s al oizt the cost; road width, <br />corner lots; bituminous vs. cement <br />City Engineer Prew responded that cost woule divided equally between the 63 build- <br />able lots with assessn-g casts ofl l,zoning with an assessment cost $1309. Road <br />widths will remaukpth' same ,eater arld road resurfacing will be done simultaneous_ <br />Owners of comer`fots will decide where to place the curb, but cannot change the water <br />flow. Bids will be f)r bituminorg curbing only, but can be changed to include concrete. <br />Prew will contact Xcel�nergy,about the possibility and cost of installing underground <br />electricity. Another Pubic Hearing would be required if underground electricity were to <br />be installed. <br />Administrator Rafferty suggested petitioning the neighborhood supporting this action. <br />Mark Busta thought the assessment amount was fair. <br />Mayor Johnson closed the Public Hearing Closed at 8:48 p.m. <br />M/S/P Johnson/Smith - to amend Resolution 2006-035, a Resolution Ordering <br />Improvement and Preparation of Plans for the Tablyn Park Neighborhood, and to include <br />an alternate bid for two landscaped islands. (Motion passed 5-0) <br />0 <br />LAKE ELMO CITY COUNCIL MINUTES APRIL 18, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.