My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
May 2, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 10:05:02 AM
Creation date
10/1/2019 3:19:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Elmo <br />Agenda Section: Planning, Land Use and Zoning <br />No. 9A <br />City Council <br />May 2, 2006 <br />Agenda Item: Zoning Variances - 8009 Hill Trail (Tacheny) <br />Background Information for May 2, 2006: <br />At its meeting April 24, 2006 the Planning Commission conducted a Public Hearing and adopted a <br />recommendation for approval of this application to remodel and enlarge an existing home on a substandard <br />lot (by area). Two variances are requested and recommended for approval: home enlargement on <br />substandard lot (by area); and, street setback to Hill Trail. The lot area is 17,000+ square feet where 39,204 <br />square feet is required for a legally non -conforming lot (which this is); and, the proposed street setback in <br />27.5 feet where 30 feet is required. <br />Findings in support of these variances relate to the scale- ofth'- house and need for legal bedrooms, <br />and the street setback of the existing structure being the same as proposed for the addition (27.5 feet). An <br />important condition of approval recommended by the Commission (and staff) is that the applicant redesign <br />and reconstructs the septic system to match the system size required for the bedroom count that will result <br />from the house expansion — from a 2 bedroom capacity to a 3 or 4 bedroom capacity. No permit for the <br />house expansion should be issued until a concurrent permit for the septic expansion is issued. No Certificate <br />of Occupancy should issued until the enlarged septic is completed and functioning as designed. <br />Person responsible: <br />Action items: <br />City Planner <br />Motion to adopt Resolution #2006 -041 approving variances at <br />8009 Hill Trail based on the recommendation and findings of the <br />Planning Commission and plans staff dated April 19, 2006, and <br />subject to a condition related to septic system improvements. <br />Attachments: <br />Time Allocated: <br />1. Draft Resolution 2006 -041 Approving Variances <br />2. Draft Planning Commission Minutes of April 24, 2006 <br />3. Planning Staff Report <br />4. Applicant's Documentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.