My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
May 2, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 10:05:02 AM
Creation date
10/1/2019 3:19:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Chu"Dillarud <br />Planning Department <br />City of Lake Elmo <br />March 29, 2006 <br />Page 3 <br />The masonry "pier" structure, to which the cross is attached,ll is <br />also unoccupied and the established height is 60'-0" above lade <br />on the drawings. <br />❑ In your response letter of Match 23, 2006, you indicate that them <br />is a conflict between sections of your ordinance. Our design is <br />based on the District Requirements noted above. <br />❑ So as not to delay the review and approval of this submittal, we <br />will request a variance to overcome the conflict and establish the <br />cross height maximum as 75' above grade and the supporting <br />masonry pier height maximums at 60' above grade. <br />• Item No. 7: Exterior site lighting manufacturer cut sheet is attached for <br />the fixture in question. This fixture head allows a 20' height pole on a 3' <br />high concrete base with a 90 degree cut off angle. <br />Item No. 8: No comment. <br />Please call with questions in any of this regard. We hope for a speedy and I <br />successful outcome. We axe positive the built outcome will be a great addition to <br />the neighborhood and the Lake Elmo Community. Thank you for your <br />cooperation. <br />Respectfully, <br />If you have any questions, or require additional information, please call me <br />651/290-1997. <br />Sincerely, <br />BWBR ARCHITECTS, INC. <br />Tom Domack <br />Project Manager <br />Attachment <br />c: Chuck Palmer, Building Committee Chair, Lakewood Evangelical Free Church <br />Paul Danielson, Project Manager, Kimley Horn <br />Peter G. Smith, Principal -In -Charge, B WBR Architects <br />/ce <br />29 DF ch, 2006 BWBR ArcMtects, Inc. 2006-03-28 DMll d Variance Request.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.