My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
May 2, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 10:05:02 AM
Creation date
10/1/2019 3:19:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 22, 2006 <br />Mr. Chuck Dillerud <br />City of Lake Elmo <br />3800 Laverne Avenue North <br />Lake Elmo, MN 55042 <br />Re: Hidden Meadows (Deer Glen) and Rockpoint Church (Lakewood Evangelical Free Churchly <br />Dear Mr. Dillerud: <br />Thank you for submitting the materials regarding the proposed Bidden Meadows (formerly known as I <br />Deer Glen) and the Rockpomt Church (formerly known as Lakewood Evangelical Free Church). The 1 <br />Rockpomt Church information is for the wastewater treatment system. The Valley Branch Watershed <br />District does not regulate nor have standards for wateewater treatment systems, so my comments within, <br />this Ietter are regarding the Hidden Meadows materials. <br />The Valley Branch Watershed District Managers approved a permit for the Deer Glen subdivision and the <br />Lakewood Evangelical Free Church on November 11, 2004. Construction of the church began Last M. <br />The plans that you provided appear consistent with the plans that were approved by the Valley Branch <br />Watershed District for the church, but not for the subdivision. Therefore, a new valley Branch <br />Watershed District Permit will be required. <br />The current plans show substantial grade changes, additional residential lots, and longer, realigned roads.) <br />These changes will add more impervious surfaces than that of the previous plans and could affect the <br />hydrology to the wetlands and the flood levels of the low areas. The developer will need to provide the I <br />necessary stormwater management features to handle the additional runoff produced from the additional <br />impervious surfaces, show that wetlands will not be negatively impacted, and ensure that the proposed <br />homes will be protected from flooding. <br />If you have any questions, please contact me at 952-832-2622. <br />Sincerely, J <br />7 P. Hanson, P.E. <br />BARR ENGINEERING COMPANY <br />Engineers for the Valley Branch Watershed District <br />c: Lincoln Fetcher, VBWD President <br />Paul Danielson, Kimley-Horn and Associates, Inc. <br />LINCOLNFETCHER DAVIDBOCHECK DONALDSCHEEL <br />VALLEY BRANCH WATERSHED DISTRICT <br />P.O. BOX 838 <br />DALE BORASH DUANE JOHNSON <br />LAKE ELMO,MINNESOTA <br />
The URL can be used to link to this page
Your browser does not support the video tag.