Laserfiche WebLink
HYK-d(-;euub 1S%5e IKDH b51 G7G YAJG-� <br />ESTIMATE NO.1 PERIOD ENDING: April <br />WATER SYSTEM INTERCONNECT - PHASE IV <br />CITY OF LAKE ELMO, MINNESOTA <br />TKDA PROJECT NO. 13186,000 <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />CONTRACT QUANTITY <br />QUANTITY TO DATE <br />UNIT <br />PRICE <br />AMOUNT <br />TO DATE <br />1 <br />MOBILIZATION <br />LS <br />1 <br />0.$ <br />$ <br />17,45820 <br />$ <br />8.729.10 <br />2 <br />TRAFFIC CONTROL <br />LS <br />1 <br />0.5 <br />$ <br />3.100-00 <br />$ <br />1.550,00 <br />3 <br />JACK/AUGER 30" $TEEL CASING <br />LF <br />175 <br />- <br />$ <br />414-00 <br />$ <br />4 <br />CONNECT TO EXISTING 8" WATERMAIN <br />EA <br />1 <br />- <br />$ <br />1,190.00 <br />S <br />- <br />6 <br />16" MJDIP, CL.52 WATERMAIN IN CASING PIPE <br />LF <br />350 <br />- <br />$ <br />72.50 <br />$ <br />- <br />& <br />DiR. DRILL 161 HOPE SDR 17 <br />LF <br />4565 <br />3,649.0 <br />$ <br />50-50 <br />$ <br />184,274.50 <br />7 <br />$" DIP, CL.52 WATERMAIN <br />LF <br />82 <br />- <br />$ <br />34.00 <br />S <br />- <br />8 <br />18- BUTTERFLY VALVE & BOX <br />EA <br />4 <br />- <br />$ <br />3,415-00 <br />S <br />- <br />9 <br />WET TAP 16" BUTTERFLY VALVE <br />EA <br />1 <br />- <br />S <br />9,035.18 <br />$ <br />- <br />10 <br />6" GATE VALVE & BOX <br />EA <br />4 <br />- <br />$ <br />$80.00 <br />$ <br />- <br />11 <br />HYDRANT <br />EA <br />4 <br />- <br />$ <br />3,470.00 <br />$ <br />- <br />12 <br />DIP WATERMAIN FITTINGS <br />LB <br />2,372 <br />- <br />$ <br />3.50 <br />$ <br />- <br />13 <br />SILT-FENGE <br />LF <br />85$ <br />- <br />$ <br />3.10 <br />$ <br />- <br />14 <br />TOPSOIL <br />CY <br />165 <br />118.0 <br />S <br />19.50 <br />$ <br />21301.00 <br />15 <br />SEED & WOOD FIBER BLANKET <br />$Y <br />1500 <br />- <br />S <br />3.40 <br />$ <br />- <br />18 <br />WATERMAIN MARKING SIGNS <br />EA <br />5 <br />- <br />S <br />50.00 <br />$ <br />- <br />- P.05 <br />