Laserfiche WebLink
NUV-162-2bbb 11-.iF9 IKOH bS1 :2`J:2 LOW P. 19b <br />CHANGE ORDER NO.3 <br />CONTRACT QUANTITY UNIT AMOUNT <br />n, IAMTITV TO OATS PRICE TO DATE <br />PARK <br />SERIAL DATE CONTRACT DUANTITY UNIT AMOUNT <br />IRRIGATION REPAIR AT WO 27TH STREET AND 7811 <br />9S <br />10'19f2006 <br />IMPERIALAVE, <br />LS <br />1.0 <br />1.0 <br />5 <br />4 m <br />5 496.35 <br />WELL REPAIR• PARTS REPLACEMENT FOR <br />1015"ON <br />CONNECTION AT PfRESS ADAPTER <br />LS <br />1.0 <br />1.0 <br />5 <br />921.00 <br />$ 821.00 <br />REMOVE LIMESTONE AT 27TH STREET(FOR <br />5t <br />10@J20W <br />SERVICE) <br />CY <br />W.0 <br />60.0 <br />$ <br />21,46 <br />6 1�267A0 <br />PIPE MATERIAL DIFFERENTIAL (SDR17 TO SDR11) <br />s0 <br />IINZJ20M <br />WATERMAIN CONNECTION FROM 28TH STREET TO <br />THE FARMS OF LAKE ELMO <br />LF <br />274.G <br />TI4.0 <br />S <br />10.02 <br />S 2,745.48 <br />REMOVAL OF TWO TREES AND BRUSH(28TH <br />iO/=DD8 <br />STREET) <br />LB <br />1.0 <br />1.0 <br />S <br />845,00 <br />S W-00 <br />REMOVAL OF UNSUITABLE MATERIALS AT IRISH <br />25 <br />9I1WO08 <br />AVENUE AND INTERSECTION OF 27TH STREET AND <br />IRISH AVENUE <br />IS <br />1.0 <br />1.9 <br />5 <br />627A0 <br />$ $27.00 <br />24 <br />9I12/2065 <br />HYDRANT RELOCATION AT 2950 JANERO AVENUE <br />IS <br />1.0 <br />110 <br />52,722.00 <br />6 Z.T22A0 <br />19 <br />NZ9/2406 <br />REMOVE UN6UITASLE MAYcRwLS AT INTERSECTION <br />OF JAMLEY AVENUE AND 26TH STREET <br />CY <br />48.0 <br />48.0 <br />S <br />2145 <br />5 1,029.W <br />829.006 <br />IMPORTEDFILL <br />LS <br />1.0 <br />10 <br />$ <br />5 00 <br />5 524,00 <br />REMOVE UMESTONE AT ZTH STREET TOR <br />16 <br />F1291=6 <br />WATERMAIN) <br />CY <br />111.1 <br />111.1 <br />S <br />214E <br />S 2 53.10 <br />8/2BY1008 <br />LOSS OF PRODUCTION <br />LS <br />1.0 <br />1.0 <br />4 <br />429.00 <br />$ 429.00 <br />w29/2W8 <br />FILLFROMONSITE <br />LS <br />1.0 <br />1.0 <br />31,610.00 <br />5 1,610.00 <br />17 <br />WW2006 <br />REMOVE CONCRETE RUBBLE IN JANERO AVENUE <br />CY <br />S81.0 <br />581.0 <br />5 <br />21.4E <br />S 12A0246 <br />8129i2(IPB <br />IMPORTED FILL <br />LS <br />1-0 <br />1.0 <br />; <br />9,699.00 <br />S OA99A0 <br />25 <br />9/1212008 <br />EXTENSION OF COMPLETION DATE DUE TO EXTRA <br />WORK FOR THE ABOVE ITEMS AND THOSE USYED <br />ON SERIAL LETTER NO. 25 INCLUDING 2.6 DAYS FOR <br />THE FARMS OF LAKE ELMO WATERMAIN <br />CONNECTION 13 9 DAYS- THE COMPLETION DATE IS <br />EXTENDED FROM OCTODER 21. 2004 TO NOVEMEER <br />1,2 WITH THIS CHANGE ORDER <br />3UETOTAL <br />5 s7,7B9.B8 <br />TOTAL CHANGE ORDER NO. 8 <br />S'� <br />