My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-19-02 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2002
>
02-19-02 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 9:40:29 AM
Creation date
10/1/2019 3:33:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Electrical Upgrades and Electrical Generator <br />City Engineer Tom Prew recommended the Council award the electrical upgrades to <br />Collins Electric in the amount of $28,700. He further recommended that the contract for <br />a 150 KW portable electrical generator be awarded to Ziegler Power Systems in the <br />amount of $52,448.06. <br />M/S/P Armstrong/DeLapp - to adopt Resolution No. 2002-042, Awarding the bid for the <br />electrical upgrades for Well House No. 1 and the lift stations to Collins Electric in the <br />amount of $28,700.00, based on a favorable recommendation of the City Engineer. <br />(Motion passed 4-0). <br />M/S/P Armstrong/DeLapp - to adopt Resolution No. 2002-043, Awarding the bid for the <br />150KW portable electric generator to Ziegler Power System in the amount of $52,448,06, <br />based on a favorable recommendation of the City Engineer. (Motion passed 4-0). <br />C. Plans and Specifications for the Re -roofing of two Fire <br />Stations/Maintenance Building, and authorizing the advertisement for <br />bids <br />Tom Prew reported in his memo dated May 15, 2002, the plans and specifications are <br />ready for the re -roofing of our two fire stations and maintenance facility. The total <br />estimate for the two roofs is $100,000, but will be bid separately. Prew stated the <br />expected life on the roofs is 20 years. Also noted in the Engineer's memo is the <br />availability of the plans for review at City Hall. <br />M/S/P DeLapp/Armstrong - to adopt Resolution No. 2002-044, Approving the plans and <br />specifications for the re -roofing of Fire Station No. 1 and the Maintenance Facility/Fire <br />Station No. 2 and authorizing the advertisement for bids. (Motion passed 4-0). <br />D. Partial Payment No.2 to Keys Well Drilling for Well No. 3 <br />Tom Prew noted in his April 15, 2002 memo that Keys Well Drilling has completed <br />drilling, is now setting casing, and will soon begin development of the well. Prew <br />recommended Partial Payment No. 2 in the amount of $33,022.00. <br />M/S/P Armstrong/Siedow - to adopt Resolution No. 2002-045, Authorizing Partial <br />Payment No. 2 in the amount of $33,022.00 to Key's Well Drilling, based on a favorable <br />recommendation by the City Engineer. (Motion passed 4-0). <br />E. Partial Payment No. 1 to EnComm Midwest for Well House No. 2 <br />Tom Prew noted in his April 15, 2002 memo that EnComm Midwest has mobilized, <br />completed water main work, had the building footings poured, and block work completed <br />for Well House No. 2. He recommended Partial Payment No. 1 in the amount of <br />$60,723.05. <br />LAKE ELMO CITY COUNCIL MINUTES MAY 21, 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.