My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-19-02 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2002
>
02-19-02 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 9:40:29 AM
Creation date
10/1/2019 3:33:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roger Hofineister stated he cannot attend the June 41h Public Hearing so he voiced his <br />concerns, such as, removal of trees, that there was no variance request for % acre for <br />septic, the lots are long and narrow and will make it look close together. Mr. Hofineister <br />was asked to put his concerns in a letter or e-mail for the meeting. <br />B. Carriage Station Site Plan <br />Planner Dillerud reported the Council approved a series of applications for Carriage <br />Station Professional Park on June 19, 2001, including PUD Development Stage Plan, <br />Preliminary Plat, Site Plan and PUD Final Stage Plan, and one of the four buildings. <br />John Arkell, developer, suggested the remaining three buildings would be architecturally <br />similar to the one approved on June, 2001. Mr. Arkell has applied for Site Plan and PUD <br />Final Plan approval for two of the three remaining (after June, 2001) buildings; and now <br />has applied for approval of the fourth building. All of the four buildings are of similar <br />architectural appearance and exterior surfacing. <br />At its May 13, 2002 meeting, the Planning Commission recommended approval of this <br />Section 520 Site Plan for the 4,800 sq.ft. structure. The planner pointed out that the <br />Limited Business exterior surfacing standards have been amended (as of May 14, 2002), <br />the Commission determined that this grouping of structures was approved as to <br />architectural concept and exterior surfacing and roofing before the new standards. This <br />fourth building is surfaced and roofed in keeping with those earlier approvals. <br />Council member Dunn stated the dead trees will be replaced and the pond functioning as <br />originally designed. <br />M/S/P DeLapp/Armstrong - to approve the Section 520 Site Plan and PUD Final Plan for <br />the structure on Lot 3, Block 1, Carriage Station Professional Park, per architectural <br />elevations staff dated May 9, 2002, subject to the following conditions: <br />1. Compliance with all applicable conditions of City Council Resolution No. 2000- <br />040 approving the PUD Plan and Master Site Plan for Carriage Station <br />Professional Park. <br />(Motion passed 4-0). <br />C. Washington County CDBG Contract <br />The city planner reported the Council approved Lake Elmo's participation in the <br />Washington County/HUD Community Development Block Grant Program by adoption <br />of a Cooperation Agreement with the County. Approximately $90,000 of CDBG grant <br />funds were approved by Washington County and HUD for use by Lake Elmo to complete <br />the Community Facilities Forecast; the Old Village Neighborhood Design Study; <br />preparation of a new Zoning Ordinance; and to develop a City strategy to assure the <br />continued viability of the Cimarron neighborhood. Attorney Filla had reviewed the <br />contract. <br />LAKE ELMO CITY COUNCIL MINUTES MAY 21, 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.