Laserfiche WebLink
57404 <br />SPEC APPROXIMATE QUANTITY COST ESTIMATE <br />ITEM UNIT 100% 100% <br />NO. WORK ITEM UNITPRICE STATE r. STATE <br />2105.501 <br />Common Excavation <br />Cu.Yd. <br />.80 <br />43453 <br />34,762.40 <br />2211.503 <br />Aggregate Base Placed, Class 5 <br />Cu.Yd. <br />6.00 <br />382 <br />2,292.00 <br />2211.503 <br />Aggregate Base Placed, Class 3 <br />Cu.Yd. <br />5.00 <br />516- <br />2,580.00 <br />2221.503 <br />Aggregate Shouldering Placed, Class 3 <br />Cu.Yd. <br />7.50 <br />166 <br />1,245.00 <br />2221.503 <br />Aggregate Shouldering Placed, Class 1 <br />Cu ad. <br />8.00 <br />72 <br />576.00 <br />2331.504 <br />Bituminous Material for Mixture <br />Ton <br />40.00 <br />34 <br />1,360.00 <br />2331.508 <br />Wearing Course Mixture <br />Ton <br />6.50 <br />305 <br />1,982.50 <br />2331.514 <br />Base Course Mixture <br />Ton <br />6.50 <br />317 <br />2,060.50 <br />2357.502 <br />Bituminous Material for Tack Coat <br />Cal. <br />.30 <br />203 <br />60.90 <br />2358.501 <br />Bituminous Material for Prime Coat <br />Gal. <br />.30 <br />1365 <br />409.50 <br />Total Estimated Cost <br />$47,328.80- <br />8% Engineering <br />3,786.30. <br />Total $51,115.10. <br />-2- <br />