My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-80 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1980
>
06-17-80 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 6:32:32 PM
Creation date
10/1/2019 4:04:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R-80-36 <br />RESOLUTION <br />CITY OF LAKE LLI.10 <br />WASHINGTON COUNTY, MINNESOTA <br />A RESOLUTION ORDERING A FEASIBILITY REPORT ON THE <br />PUMPING OF THE FLOOD WATERS OF LEGION POND TO LAKE <br />ELMO AND ORDERING A HEARING ON THE FEASIBILITY REPORT. <br />WHEREAS, several septic <br />Legion Avenue are under water as <br />Legion Pond; and, <br />tanks that serve property along <br />a result of the high water on <br />WHEREAS, several homes along Legion Avenue are threatened <br />by high water on Legion Pond; and, <br />WHEREAS, the most cost effective remedy to the high water <br />in Legion Pond appears to be pumping the floodwaters to Lake Elmo; <br />and, <br />WHEREAS, the City Council, from past experience,, believes <br />the project may be feasible and wants to promote rapid consideration <br />of the Feasibility Study by the affected property owners; and, <br />WHEREAS, I -lie floodwaters on Legion Pond are creating a <br />public health and safety hazard: <br />Z BE IT RESOLVED, by the City Council of the <br />NOW, THEREFORE, <br />City of Lake Elmo, Washington County, Minnesota, that: <br />The City Engineer is hereby ordered to prepare a Feasibility <br />Report on pumping the floodwaters from Legion Pond into Lake Elmo <br />with City pumps and irrigation pipe, acquiring the necessary permits <br />and easements, and, for the purposes of relating costs to those to <br />he assessed, estimate the cost of pumping 30 acre feet from Legion <br />Pond to Lake Elmo; and, <br />A public hearing on the feasibility of said project is <br />hereby scheduled for July S, 1980, at 7:30 p.m, in the City Hall, <br />of the City of Lake Elmo. <br />ADOPTED, this the 17th day of June, 1980 by the City Council <br />of the City of Lake Elmo, Washington County, Minnesota. Vote: <br />Armstrong, Morgan, Mottaz and Pott voting aye. Novak voting nay. <br />SIGNED: <br />ATTEST: rM tl�o Mayor <br />er, City Admi—IRIA-t—fa- <br />
The URL can be used to link to this page
Your browser does not support the video tag.